[Sample B: Approval/Signature Sheet] - George Mason University
[Sample B: Approval/Signature Sheet] - George Mason University
[Sample B: Approval/Signature Sheet] - George Mason University
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
A 2.11 Capacity<br />
Amount of data that can be transmitted or received by data link equipment (Mbts).<br />
A2.12 Secure<br />
Communications security capabilities supported by the ACFT (data).<br />
A3.1 Fuel Capacity<br />
Maximum fuel a tanker ACFT is capable to transport, that is available to refuel receiver<br />
ACFTs.<br />
A3.2 Receiver<br />
Capability to be refueled in the air.<br />
A3.3 Range<br />
Distance aircraft can travel, under given conditions, without refueling in flight (Nm x<br />
1000).<br />
A3.4 Payload Weight<br />
The sum of the weight of passengers and cargo that an aircraft can carry (Lbs).<br />
A3.5 Preparedness<br />
Level of preparedness of the runway (pavement type) that the ACFT is capable to operate<br />
safely.<br />
Unprepared – An unsurfaced natural ground area suitable for operation with little or no<br />
preparation.<br />
Semi-prepared – Unpaved semi-prepared compacted surface (gravel, dirt).<br />
Prepared – Paved runway (asphalt or concrete).<br />
A4.1 Scope<br />
See A1.2<br />
A4.2 Radius of Action<br />
See A1.1<br />
102