02.08.2013 Views

[Sample B: Approval/Signature Sheet] - George Mason University

[Sample B: Approval/Signature Sheet] - George Mason University

[Sample B: Approval/Signature Sheet] - George Mason University

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A 2.11 Capacity<br />

Amount of data that can be transmitted or received by data link equipment (Mbts).<br />

A2.12 Secure<br />

Communications security capabilities supported by the ACFT (data).<br />

A3.1 Fuel Capacity<br />

Maximum fuel a tanker ACFT is capable to transport, that is available to refuel receiver<br />

ACFTs.<br />

A3.2 Receiver<br />

Capability to be refueled in the air.<br />

A3.3 Range<br />

Distance aircraft can travel, under given conditions, without refueling in flight (Nm x<br />

1000).<br />

A3.4 Payload Weight<br />

The sum of the weight of passengers and cargo that an aircraft can carry (Lbs).<br />

A3.5 Preparedness<br />

Level of preparedness of the runway (pavement type) that the ACFT is capable to operate<br />

safely.<br />

Unprepared – An unsurfaced natural ground area suitable for operation with little or no<br />

preparation.<br />

Semi-prepared – Unpaved semi-prepared compacted surface (gravel, dirt).<br />

Prepared – Paved runway (asphalt or concrete).<br />

A4.1 Scope<br />

See A1.2<br />

A4.2 Radius of Action<br />

See A1.1<br />

102

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!