02.08.2013 Views

[Sample B: Approval/Signature Sheet] - George Mason University

[Sample B: Approval/Signature Sheet] - George Mason University

[Sample B: Approval/Signature Sheet] - George Mason University

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

needed, which ones should be acquired or developed and what is the priority among<br />

them. 31<br />

2.3 Issues with the Current Methodology<br />

Currently, the analysis of the OCRs is based solely on the experience of the<br />

OPS‘s staff and there is no systematic method in place to guide the prioritization of the<br />

requests. Hence, it is a challenging task to evaluate and compare the contribution of each<br />

system to the BAF‘s operational capability.<br />

The lack of an integrated performance measurement and management model<br />

makes it difficult for the OPS‘s analysts to choose which OCRs will be accepted<br />

(generate a POR) and which ones will be rejected. This scenario can lead to a non<br />

optimal budget allocation, leaving vulnerable areas without the needed resources and<br />

important programs unfunded.<br />

In addition to that, the performance indicators currently in use to evaluate the<br />

OCRs are not necessarily designed using the strategic documents as a guide. This<br />

situation might lead to the use of the wrong indicators, not directly related with the<br />

strategic plan.<br />

31 Jobim, ―A Defesa na Agenda Nacional: O Plano Estratégico de Defesa,‖ 10.<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!