Water Quality Certification - Continued<br />

Arizona Mining Permitting Guide<br />

AVERAGE PROCESSING TIME:<br />

Review time depends upon the completeness of the information provided to ADEQ, the<br />

complexity and size of the proposed activity, and the sensitivity of the impacted watercourse.<br />

Typical processing time is 30 days; a complex project with changes may take longer.<br />

FORMS:<br />

Information and links to forms:<br />

www.azdeq.gov/environ/water/permits/download/401app2.pdf<br />

105