18.08.2013 Views

ARIZONA MINING PERMITTING GUIDE - AZGS Document Repository

ARIZONA MINING PERMITTING GUIDE - AZGS Document Repository

ARIZONA MINING PERMITTING GUIDE - AZGS Document Repository

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Arizona Mining Permitting Guide<br />

Used Oil Handler, Quarterly Reports - Continued<br />

AVERAGE PROCESSING TIME:<br />

Quarterly reports are due within thirty (30) calendar days following the end of the calendar<br />

quarter to which the reports apply (e.g., the report for the period October through December,<br />

1999, is due by January 30, 2000).<br />

FORMS:<br />

Forms for used oil transporters, processors, and refiners quarterly reports:<br />

www.azdeq.gov/environ/waste/solid/6l.html<br />

85

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!