Dry Well Registration<br />
Arizona Mining Permitting Guide<br />
Arizona Department of Environmental Quality (ADEQ)<br />
Groundwater Section<br />
1110 West Washington Street, 5415B-3<br />
Phoenix, AZ 85007<br />
602-771-4428<br />
www.azdeq.gov/environ/water/index.html<br />
PERMITS, AUTHORIZATIONS OR FILINGS:<br />
Dry Well Registration<br />
LEGAL AUTHORITY:<br />
A.R.S. § 49-245-02<br />
A.R.S. § 49-331-336<br />
A.R.S. § 49-250.23<br />
A.R.S. § 49-201.5<br />
CONDITIONS REQUIRING PERMITS, AUTHORIZATIONS OR FILINGS:<br />
The purpose of registration is to minimize groundwater impacts and ensure that only storm<br />
water enters a dry well.<br />
New dry wells must be registered with ADEQ within 30 days of starting operation. Closure<br />
of dry wells must follow ADEQ’s Dry Well Decommissioning Guidelines. Aquifer Protection<br />
Permit (APP) requirements apply to dry wells that drain areas where hazardous substances are<br />
used, stored, loaded or treated or where motor fuels are dispensed. Any dry well that is used<br />
for industrial wastewater disposal either solely or in conjunction with storm water is an<br />
injection well, and an APP is required for operation or closure.<br />
EXEMPTIONS:<br />
Exemption from obtaining an APP for closure can be secured if “clean closure” can be<br />
demonstrated. In addition, certain discharges to dry wells in combination with storm water are<br />
exempt from the APP requirements under A.R.S. § 49-250(23).<br />
FEES:<br />
A $100 fee is charged per dry well registration. APP fees are required if a Type 2 general APP<br />
or an individual APP is required.<br />
AVERAGE PROCESSING TIME:<br />
Registration must be complete within 30 days of the completion of the well. Review time for<br />
the registration varies with the complexity of the submittal.<br />
62