18.08.2013 Views

ARIZONA MINING PERMITTING GUIDE - AZGS Document Repository

ARIZONA MINING PERMITTING GUIDE - AZGS Document Repository

ARIZONA MINING PERMITTING GUIDE - AZGS Document Repository

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Arizona Mining Permitting Guide<br />

Construction, Enlargement, Repair, Alteration, or Removal of Dams - Continued<br />

AVERAGE PROCESSING TIME:<br />

Completeness review for the construction, enlargement, repair, alteration, or removal of a<br />

dam must be completed within 120 days and substantive review within 60 days (R12-15-401).<br />

FORMS:<br />

Instructions for preparing an application package:<br />

www.azwater.gov/AzDWR/SurfaceWater/DamSafety/documents/Instructions_for_Filing_a_<br />

Dam_Safety_Application.pdf<br />

59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!