ARIZONA MINING PERMITTING GUIDE - AZGS Document Repository
ARIZONA MINING PERMITTING GUIDE - AZGS Document Repository
ARIZONA MINING PERMITTING GUIDE - AZGS Document Repository
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Air Quality Control Permit<br />
Arizona Mining Permitting Guide<br />
Arizona Department of Environmental Quality (ADEQ)<br />
Air Quality Permits Section<br />
1110 West Washington Street<br />
Phoenix, AZ 85007<br />
602 771-2308<br />
www.azdeq.gov/environ/air/index.html<br />
PERMITS, AUTHORIZATIONS OR FILINGS:<br />
Air Quality Control Permit<br />
LEGAL AUTHORITY:<br />
A.R.S. § 49-421 et seq.<br />
A.R.S. § 49-471 et seq.<br />
CONDITIONS REQUIRING PERMITS, AUTHORIZATIONS OR FILINGS:<br />
The Air Quality Permits Program ensures that the air pollutants emitted from various sources<br />
do not exceed National Ambient Air Quality Standards or cause significant deterioration in<br />
areas which presently have clean air. The program also ensures the preservation of air quality<br />
in our wilderness areas and controls risks caused by the emission of hazardous air pollutants.<br />
Any source that releases, into the air, a regulated air pollutant above specified levels will be<br />
required to first obtain an air quality permit or permit revision to construct, operate or make a<br />
modification.<br />
Arizona Revised Statutes § 49-402 allows counties to assume jurisdiction over stationary<br />
sources of air pollutants, with the exception of refineries, copper smelters, coal-fired power<br />
plants and Portland cement plants. In Arizona, three counties (Maricopa, Pima and Pinal)<br />
issue air quality permits for mining. Elsewhere in the state, ADEQ issues air quality permits<br />
for mining.<br />
EXEMPTIONS:<br />
Some situations that are exempt from the permitting process include: new residential wood<br />
heaters, some asbestos demolition and renovation projects, and agricultural equipment used in<br />
normal farm operations.<br />
FEES:<br />
Permit fees are based on the size and type of facility, applicability of state and federal rules<br />
and regulations, and the type of permit or permit revisions applied for.<br />
89