Uranium Milling License<br />

Arizona Mining Permitting Guide<br />

U.S. Nuclear Regulatory Commission (NRC) - Region IV<br />

611 Ryan Plaza Drive, Suite 400<br />

Arlington, TX 76011-8064<br />

817-860-8100<br />

www.nrc.gov/materials/fuel-cycle-fac/licensing.html<br />

PERMITS, AUTHORIZATIONS OR FILINGS:<br />

Uranium Milling License<br />

Fuel Cycle Facilities License<br />

LEGAL AUTHORITY:<br />

A.R.S. § 30-696<br />

10 C.F.R. Parts 30, 40, 70, 74, 76<br />

CONDITIONS REQUIRING PERMITS, AUTHORIZATIONS OR FILINGS:<br />

A company that wishes to operate a fuel cycle material facility must submit an application to<br />

the MRC. This application must demonstrate how the facility will be operated to ensure<br />

adequate safety and safeguards in accordance with NRC licensing regulations. NRC reviews<br />

the application according to procedures and criteria documented in a Standard Review Plan. If<br />

the application is approved, a license is issued. The license contains the amount and type of<br />

material that the facility is allowed to possess and any special conditions imposed by the<br />

MRC. Fuel cycle material licenses are typically issued for 10 years.<br />

EXEMPTIONS:<br />

None<br />

FEES:<br />

$18,700 for a Class I or Class II. A Class I license includes mill licenses issued for the<br />

extraction of uranium ore. A Class II license includes solution mining licenses (In-situ and<br />

heap leach) issued for the extraction of uranium from uranium ores including research and<br />

development licenses. Special circumstances may incur additional charges prorated at $259<br />

per hour.<br />

AVERAGE PROCESSING TIME:<br />

Review time depends on the completeness of information provided. Minimum processing<br />

time is two years.<br />

FORMS:<br />

Standard Review Plan for the Review of a License Application for a Fuel Cycle Facility:<br />

www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1520/final/index.html<br />

171