Uranium Milling License<br />
Arizona Mining Permitting Guide<br />
U.S. Nuclear Regulatory Commission (NRC) - Region IV<br />
611 Ryan Plaza Drive, Suite 400<br />
Arlington, TX 76011-8064<br />
817-860-8100<br />
www.nrc.gov/materials/fuel-cycle-fac/licensing.html<br />
PERMITS, AUTHORIZATIONS OR FILINGS:<br />
Uranium Milling License<br />
Fuel Cycle Facilities License<br />
LEGAL AUTHORITY:<br />
A.R.S. § 30-696<br />
10 C.F.R. Parts 30, 40, 70, 74, 76<br />
CONDITIONS REQUIRING PERMITS, AUTHORIZATIONS OR FILINGS:<br />
A company that wishes to operate a fuel cycle material facility must submit an application to<br />
the MRC. This application must demonstrate how the facility will be operated to ensure<br />
adequate safety and safeguards in accordance with NRC licensing regulations. NRC reviews<br />
the application according to procedures and criteria documented in a Standard Review Plan. If<br />
the application is approved, a license is issued. The license contains the amount and type of<br />
material that the facility is allowed to possess and any special conditions imposed by the<br />
MRC. Fuel cycle material licenses are typically issued for 10 years.<br />
EXEMPTIONS:<br />
None<br />
FEES:<br />
$18,700 for a Class I or Class II. A Class I license includes mill licenses issued for the<br />
extraction of uranium ore. A Class II license includes solution mining licenses (In-situ and<br />
heap leach) issued for the extraction of uranium from uranium ores including research and<br />
development licenses. Special circumstances may incur additional charges prorated at $259<br />
per hour.<br />
AVERAGE PROCESSING TIME:<br />
Review time depends on the completeness of information provided. Minimum processing<br />
time is two years.<br />
FORMS:<br />
Standard Review Plan for the Review of a License Application for a Fuel Cycle Facility:<br />
www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1520/final/index.html<br />