Arizona Mining Permitting Guide<br />

Solid Waste or Special Waste Facility Plan or Aquifer Protection Permit - Continued<br />

AVERAGE PROCESSING TIME:<br />

Review time is 6 to 18 months based on the complexity of the facility and the type of permit.<br />

Arizona licensing timeframes apply pursuant to A.R.S. § 41-1072 through 1079 and A.A.C.<br />

R18-1-501 through 525.<br />

FORMS:<br />

Guidance and forms:<br />

www.azdeq.gov/environ/waste/solid/plan.html<br />