Not all re<strong>com</strong>mendations will be addressed through the SHA Streetscape Project. The<br />

installation of a pedestrian hybrid signal—more <strong>com</strong>monly referred to as a HAWK (high<br />

intensity activated crosswalk) signal—at a midblock crossing on Branch Avenue is unlikely. SHA<br />

currently does not support midblock crossing signals, but it is important to note the potential<br />

need for a crossing at this location for future consideration. This study re<strong>com</strong>mends that the<br />

final <strong>Naylor</strong> <strong>Road</strong> <strong>Station</strong> site plan should consider such pedestrian desire lines when locating<br />

new streets through the station area. Ideally these streets will eliminate the existing superblock<br />

pattern along Branch Avenue <strong>and</strong> provide multiple safe crossing points for pedestrians.<br />

Other re<strong>com</strong>mendations include installing rapid flash beacons at <strong>Naylor</strong> <strong>Road</strong> roundabouts <strong>and</strong><br />

the right-turn lane at Branch Avenue to alert motorists of crossing pedestrians (see Figure 49).<br />

Pedestrians are currently at risk when crossing these roundabouts, as motorists often continue<br />

through the intersections without yielding. Rapid flash beacons are user actuated, either by<br />

pressing a push button or with the aid of a pedestrian detection system.<br />

<strong>Metro</strong>’s Pedestrian <strong>and</strong> Bicycle Element of the 2012-2017 Capital Improvement Program re<strong>com</strong>mends<br />

establishing a formal pedestrian pathway through the Park & Ride lot from the Oxon Run Drive<br />

roundabout. Many pedestrians already follow the course of this proposed path when accessing<br />

the station, which causes them to cross vehicular traffic at several unmarked locations. This<br />

pathway should include paved sidewalks, designated crosswalks, <strong>and</strong> wayfinding signage.<br />

The Park & Ride lot may lose some parking spaces depending on the path’s actual alignment, if<br />

implemented.<br />

Table 25: Pedestrian <strong>and</strong> Bicycle Re<strong>com</strong>mendations<br />

Figure<br />

Location 47 ID Re<strong>com</strong>mendation<br />

<strong>Naylor</strong> Rd 1 Add pedestrian signals, crosswalks, <strong>and</strong> pedestrian refuge areas at Suitl<strong>and</strong> Pkwy intersection<br />

2 Add sidewalks on east side between Suitl<strong>and</strong> Pkwy <strong>and</strong> Oxon Run Dr, <strong>and</strong> on both sides north of Suitl<strong>and</strong> Pkwy<br />

3* Add shared lane markings <strong>and</strong> “Bikes May Use Full Lane” signs north of Suitl<strong>and</strong> Pkwy<br />

4 Add proposed bicycle lanes <strong>and</strong> shared lane markings south of Suitl<strong>and</strong> Pkwy<br />

5 Add proposed sidewalks <strong>and</strong> remove fence along observed pedestrian desire lines<br />

6 Install rapid flash beacons at roundabout crosswalks <strong>and</strong> crosswalk at the right-turn lane to Branch Ave<br />

7* Study additional marked crossing between Good Hope Ave <strong>and</strong> Branch Ave<br />

Branch Ave 8 Add sidewalk on east side between station entrance <strong>and</strong> Southern Ave<br />

9 Add proposed bicycle lanes from the District line south<br />

10 Add proposed pedestrian signals <strong>and</strong> crosswalks at all approaches at station entrance intersection<br />

11 Add pedestrian refuge areas <strong>and</strong> reduce northbound right-turn radius at station entrance intersection<br />

12 Add proposed new <strong>and</strong> widened sidewalks south of station entrance intersection<br />

13* Study midblock pedestrian hybrid signal south of station entrance intersection<br />

Oxon Run Dr 14 Add new <strong>and</strong> widen existing sidewalks<br />

15* Add shared lane markings <strong>and</strong> “Bikes May Use Full Lane” signs<br />

16 Add connection to proposed Oxon Run Trail<br />

17 Add curb extension, crosswalks, <strong>and</strong> reduce curb radii at Oxon Park St intersection<br />

Good Hope Ave 18 Add sidewalks on west side<br />

Suitl<strong>and</strong> Pkwy 19 Implement proposed Suitl<strong>and</strong> Parkway multi-use path into Maryl<strong>and</strong><br />

Oxon Run Park 20 Implement proposed Oxon Run Trail<br />

<strong>Station</strong> Footprint: 21 Add pathway from Oxon Run Dr through Park & Ride lot to station entrance<br />

Bike & Pedestrian 22 Add at least 10 bicycle parking spaces<br />

General N/A Implement improved wayfinding signage<br />

* More detailed study <strong>and</strong> analysis is required to determine overall feasibility<br />