Naylor Road Metro Station Area Access and Capacity - WMATA.com.
Naylor Road Metro Station Area Access and Capacity - WMATA.com.
Naylor Road Metro Station Area Access and Capacity - WMATA.com.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Figure 49: Rapid Flash Beacon (left) <strong>and</strong> Existing <strong>Naylor</strong> <strong>Road</strong> Roundabout<br />
Implementing bicycle lanes<br />
Signs<br />
<strong>and</strong> pathways proposed in the<br />
2009 Prince George’s Countywide<br />
Master Plan of Transportation<br />
<strong>and</strong> the 2005 District of Columbia<br />
Bicycle Master Plan would greatly<br />
exp<strong>and</strong> bicycle access. Proposed<br />
facilities include a Branch Avenue<br />
bicycle lane from the District<br />
boundary south to the Capital<br />
Beltway (I-495), a Branch Avenue<br />
bicycle lane within the District<br />
with a terminus at Southern<br />
Avenue, <strong>and</strong> two off-street<br />
hard-surface trails: a new Oxon<br />
Run Trail (located entirely on<br />
Source: Eric O’Brien (Creative Commons, left image only)<br />
M-NCPPC l<strong>and</strong> that will provide<br />
access to <strong>Naylor</strong> <strong>Road</strong> <strong>and</strong><br />
Southern Avenue station) <strong>and</strong> the extension of the Suitl<strong>and</strong> Parkway Trail southeast to Branch<br />
Avenue <strong>Station</strong> from its current terminus at the District line. Implementation of a portion of the<br />
Branch Avenue bicycle lanes—from the station entrance to Curtis Drive—is planned as part of<br />
the SHA Streetscape Project. Though not proposed in the SHA Streetscape Project, this study<br />
re<strong>com</strong>mends further study <strong>and</strong> analysis of shared lane markings <strong>and</strong> “Bikes May Use Full Lane”<br />
signs on <strong>Naylor</strong> <strong>Road</strong> north of Suitl<strong>and</strong> Parkway.<br />
While dem<strong>and</strong> for bicycle parking is low at <strong>Naylor</strong> <strong>Road</strong> <strong>Station</strong> today, improving bicycle access<br />
with the re<strong>com</strong>mended lanes <strong>and</strong> pathways should encourage more cyclists. <strong>Metro</strong> would need<br />
to construct at least 10 additional bicycle parking spaces 2 at <strong>Naylor</strong> <strong>Road</strong> <strong>Station</strong> in support of<br />
the agency’s 3.5 percent systemwide bicycle mode share goal.<br />
<strong>Metro</strong>’s Pedestrian <strong>and</strong> Bicycle Element of the 2012-2017 Capital Improvement Program re<strong>com</strong>mends<br />
placing additional parking within sight of the station manager to reduce the opportunity for<br />
theft, a known issue at the station. Given those considerations, the most suitable location for<br />
additional bicycle parking is east of the station entrance.<br />
This study re<strong>com</strong>mends the development of consistent wayfinding signage to direct pedestrians<br />
<strong>and</strong> cyclists to the station. Wayfinding signage will be particularly important as bicycle lanes <strong>and</strong><br />
pathways are constructed, <strong>and</strong> as the station redevelops <strong>and</strong> foot traffic increases.<br />
2. A st<strong>and</strong>ard<br />
U-rack can<br />
ac<strong>com</strong>modate<br />
two bicycles,<br />
while a locker<br />
ac<strong>com</strong>modates<br />
one.<br />
Bus<br />
Buses operate relatively well at <strong>Naylor</strong> <strong>Road</strong> <strong>Station</strong>, as the bus bays are able to smoothly<br />
ac<strong>com</strong>modate all routes that currently serve the station. The current bus bay configuration can<br />
adequately serve increases in bus activity estimated for 2040. Therefore, physical changes to the<br />
bus bay facility are not needed, though this study assumes the existing facility will be relocated<br />
or at least altered as a result of station area redevelopment. Re<strong>com</strong>mendations for bus operations<br />
are highlighted in Table 26.<br />
<strong>Naylor</strong> <strong>Road</strong> <strong>Metro</strong> <strong>Station</strong> <strong>Area</strong> <strong>Access</strong> <strong>and</strong> <strong>Capacity</strong> Study | 56