- Page 1 and 2:
Draft Ku-ring-gai Development Contr
- Page 3 and 4:
CONTENTS C PART 1 INTRODUCTION Intr
- Page 5 and 6:
CONTENTS (CONTINUED) C PART 9 OFFIC
- Page 7 and 8:
PART 1 Introduction Introduction 1.
- Page 9 and 10:
1.1 PRELIMINARY 1 1.1.1 Purpose of
- Page 11 and 12:
1.2 STRUCTURE OF THIS DCP 1 How is
- Page 13 and 14:
INTRODUCTION 1.2 STRUCTURE OF THIS
- Page 15 and 16:
PART 2 Definitions Introduction 2.1
- Page 17 and 18:
2.1 DEFINITIONS 2 In this DCP the f
- Page 19 and 20:
2.1 DEFINITIONS (CONTINUED) 2 coved
- Page 21 and 22:
2.1 DEFINITIONS (CONTINUED) 2 furni
- Page 23 and 24:
2.1 DEFINITIONS (CONTINUED) 2 main
- Page 25 and 26:
2.1 DEFINITIONS (CONTINUED) 2 remna
- Page 27 and 28:
2.1 DEFINITIONS (CONTINUED) 2 trunk
- Page 29 and 30:
PART 3 Site Analysis Introduction 3
- Page 31 and 32:
3.1 SITE ANALYSIS 3 Objectives Cont
- Page 33 and 34:
Amalgamation and Subdivision Introd
- Page 35 and 36:
4.1 AMALGAMATION 4 Objectives 1. To
- Page 37 and 38:
4.3 BUILDING FOOTPRINT 4 Objectives
- Page 39 and 40:
4.5 INFRASTRUCTURE 4 Controls prope
- Page 41 and 42:
4.6 STRATA AND COMMUNITY TITLE SUBD
- Page 43 and 44:
PART 5A 5 Pymble Business Park - Pr
- Page 45 and 46:
5.1 URBAN PRECINCT (CONTINUED) 5 Ob
- Page 47 and 48:
5.2 COMMUNITY INFRASTRUCTURE (CONTI
- Page 49 and 50:
5.3 BUILDING SETBACKS (CONTINUED) 5
- Page 51 and 52:
5.4 BUILT FORM (CONTINUED) 5 Object
- Page 53 and 54:
5.5 PUBLIC DOMAIN AND PEDESTRIAN AC
- Page 55 and 56:
5.6 HERITAGE (continued) 5 Objectiv
- Page 57 and 58:
PART 6 Site Design Introduction 6.1
- Page 59 and 60:
6.1 GENERAL 6 Objectives Controls 1
- Page 61 and 62:
6.2 EARTHWORKS AND SLOPE (continued
- Page 63 and 64:
6.3 LANDSCAPING (continued) 6 Objec
- Page 65 and 66:
6.4 BUILDING SETBACKS 6 Objectives
- Page 67 and 68:
6.6 DEEP SOIL LANDSCAPING 6 Objecti
- Page 69 and 70:
PART 7 Access and Parking Introduct
- Page 71 and 72:
7.1 PEDESTRIAN ACCESS/EQUITABLE ACC
- Page 73 and 74:
7.2 VEHICLE ACCESS 7 Objectives Con
- Page 75 and 76:
7.3 SERVICE ACCESS AND LOADING FACI
- Page 77 and 78:
7.4 BASEMENT CAR PARKING 7 Objectiv
- Page 79 and 80:
7.6 PARKING FOR PEOPLE WITH A DISAB
- Page 81 and 82:
7.8 CAR PARKING PROVISION 7 Objecti
- Page 83 and 84:
7.8 CAR PARKING PROVISION (continue
- Page 85 and 86:
7.9 BICYCLE PARKING AND FACILITIES
- Page 87 and 88:
PART 7R 7R References 7R.1 Car Park
- Page 89 and 90:
7R.1 CAR PARKING RATES (continued)
- Page 91 and 92: 7R.1 CAR PARKING RATES (continued)
- Page 93 and 94: PART Building Design and Sustainabi
- Page 95 and 96: 8.1 GREEN BUILDINGS 3 Objectives 1
- Page 97 and 98: 8.1 GREEN BUILDINGS (continued) 3 C
- Page 99 and 100: 8.2 HERITAGE CONSERVATION This sect
- Page 101 and 102: 8.2 HERITAGE CONSERVATION (CONTINUE
- Page 103 and 104: 8.3 SOCIAL IMPACT 8 Objectives 1 To
- Page 105 and 106: 8.4 MATERIALS, FINISHES AND COLOURS
- Page 107 and 108: 8.5 ROOF FORMS, TERRACES AND PODIUM
- Page 109 and 110: Objectives 1 To provide distinct bu
- Page 111 and 112: 8.8 BUILDING SERVICES 8 Objectives
- Page 113 and 114: 8.9 WASTE MANAGEMENT (continued) 8
- Page 115 and 116: 8.9 WASTE MANAGEMENT (continued) 8
- Page 117 and 118: 8.10 DEVELOPMENT NEAR ROAD OR RAIL
- Page 119 and 120: 8.11 CONSTRUCTION, DEMOLITION AND D
- Page 121 and 122: 8.11 CONSTRUCTION DEMOLITION AND DI
- Page 123 and 124: PART 8R 8R References 8R.1 Green St
- Page 125 and 126: 8R.1 GREEN STAR GUIDE (continued) 8
- Page 127 and 128: REFERENCES 8R.1 GREEN STAR GUIDE (c
- Page 129 and 130: 8R.1 GREEN STAR GUIDE (continued) 8
- Page 131 and 132: 8R.1 GREEN STAR GUIDE (continued) 8
- Page 133 and 134: 8R.2 WASTE GUIDELINES (continued) 8
- Page 135 and 136: 8R.2 WASTE GUIDELINES (continued) 8
- Page 137 and 138: REFERENCES 8R.2 WASTE GUIDELINES (c
- Page 139 and 140: REFERENCES 8R.2 WASTE GUIDELINES (c
- Page 141: 8R.2 WASTE GUIDELINES (continued) 8
- Page 145 and 146: Objectives 1 To ensure a high level
- Page 147 and 148: 9.3 OFFICE FLOOR DEPTH 9 Objectives
- Page 149 and 150: Objectives 1 To provide accessible,
- Page 151 and 152: Objectives 1 To promote buildings o
- Page 153 and 154: Objectives 1 To ensure internal cei
- Page 155 and 156: PART 10 Signage and Advertising Int
- Page 157 and 158: 10.1 SIGNAGE DESIGN 10 Objectives C
- Page 159 and 160: 10.3 BUSINESS IDENTIFICATION SIGNS
- Page 161 and 162: 10.5 PROHIBITED ADVERTISING SIGNS A
- Page 163 and 164: 10.7 SPECIAL SIGNS 10 Objectives Co
- Page 165 and 166: 10.8 TEMPORARY SIGNS (continued) 10
- Page 167 and 168: PART 11 Land Contamination Introduc
- Page 169 and 170: 11.1 LAND CONTAMINATION 3 Objective
- Page 171 and 172: PART 12 Riparian Land Controls Intr
- Page 173 and 174: 12.1 GENERAL 12 Objectives Controls
- Page 175 and 176: 12.2 CATEGORY 2 TERRESTRIAL AND AQU
- Page 177 and 178: 12.3 CATEGORY 3 BANK STABILITY AND
- Page 179 and 180: 12R 12 R References 12R.1 Riparian
- Page 181 and 182: PART 13 Biodiversity Controls Intro
- Page 183 and 184: INTRODUCTION 13 This Part is set ou
- Page 185 and 186: 13.2 CATEGORY 2 - SUPPORT FOR CORE
- Page 187 and 188: 13.4 CATEGORY 4 - BIODIVERSITY CORR
- Page 189 and 190: 13.6 NO NET LOSS OF BIODIVERSITY 13
- Page 191 and 192: 13.6 NO NET LOSS OF BIODIVERSITY (c
- Page 193 and 194:
PART 13R 13R References 13R.1 Green
- Page 195 and 196:
13R.2 SUMMARY OF METHODOLOGY FOR CO
- Page 197 and 198:
13R.2 SUMMARY OF METHODOLOGY FOR CO
- Page 199 and 200:
THIS PAGE IS INTENTIONALLY LEFT BLA