8.1 GREEN BUILDINGS (continued)<br />

3<br />

Controls<br />

4 Where the GBCA has a Rating Tool, applicants are required to<br />

submit documentation prepared by a GBCA Accredited Professional<br />

showing how the design proposal will achieve the required Green<br />

Star rating. The following documentation is required for Development<br />

Application submission:<br />

i) Credit Summary: showing the point distribution for the proposal<br />

and the predicted point sco<strong>ring</strong> for the Green Star rating<br />

(Refer to 8R.1 of this Part for an example);<br />

ii) Ecologically Sustainable Design (ESD) Report: stating strategy,<br />

methods and systems proposed to achieve the Green Star<br />

rating, including the requirements in (1) of this section;<br />

iii) Annotated Development Application Drawings: clearly indicating<br />

the Green Star rating elements described in the ESD Report.<br />

iv) A signed Statement of Commitment from the applicant to<br />

implement and achieve a Green Star Certified development.<br />

Note 1: The signed Statement of Commitment binds the applicant to<br />

continue consultation with their GBCA Accredited Professional to develop<br />

and submit the DA approved design to GBCA for formal Certifi cation.<br />

Refer to www.gbca.org.au for a list of Green Star Accredited Professionals.<br />

Note 2: Approved DAs will have a Condition of Consent requi<strong>ring</strong><br />

the applicant to include the following documentation as part of their<br />

Construction Certifi cate submission:<br />

i. An updated Credit Summary and ESD Report describing elements/<br />

systems incorporated to achieve nominated Green Star rating;<br />

ii. A Checklist Table of each ESD system/element (refer to 8R.1 of this<br />

Part);<br />

iii. Annotated Construction Certifi cate Drawings clearly indicating<br />

elements/systems described in the ESD Report including the<br />

requirements of (1) in this section;<br />

iv. A copy of the letter and invoices from the GBCA to the applicant,<br />

confi rming the project is registered for Green Star Rating.<br />

Note 3: Approved DAs will have a Condition of Consent requi<strong>ring</strong> the<br />

applicant to submit to <strong>Council</strong> the GBCA Green Star Certifi cate prior to the<br />

release of the Occupation Certifi cate.<br />

BUILDING DESIGN<br />

Draft <strong>Ku</strong>-<strong>ring</strong>-<strong>gai</strong> Local Centres Development Control Plan 2012<br />

p 91