8.1 GREEN BUILDINGS (continued)<br />
3<br />
Controls<br />
4 Where the GBCA has a Rating Tool, applicants are required to<br />
submit documentation prepared by a GBCA Accredited Professional<br />
showing how the design proposal will achieve the required Green<br />
Star rating. The following documentation is required for Development<br />
Application submission:<br />
i) Credit Summary: showing the point distribution for the proposal<br />
and the predicted point sco<strong>ring</strong> for the Green Star rating<br />
(Refer to 8R.1 of this Part for an example);<br />
ii) Ecologically Sustainable Design (ESD) Report: stating strategy,<br />
methods and systems proposed to achieve the Green Star<br />
rating, including the requirements in (1) of this section;<br />
iii) Annotated Development Application Drawings: clearly indicating<br />
the Green Star rating elements described in the ESD Report.<br />
iv) A signed Statement of Commitment from the applicant to<br />
implement and achieve a Green Star Certified development.<br />
Note 1: The signed Statement of Commitment binds the applicant to<br />
continue consultation with their GBCA Accredited Professional to develop<br />
and submit the DA approved design to GBCA for formal Certifi cation.<br />
Refer to www.gbca.org.au for a list of Green Star Accredited Professionals.<br />
Note 2: Approved DAs will have a Condition of Consent requi<strong>ring</strong><br />
the applicant to include the following documentation as part of their<br />
Construction Certifi cate submission:<br />
i. An updated Credit Summary and ESD Report describing elements/<br />
systems incorporated to achieve nominated Green Star rating;<br />
ii. A Checklist Table of each ESD system/element (refer to 8R.1 of this<br />
Part);<br />
iii. Annotated Construction Certifi cate Drawings clearly indicating<br />
elements/systems described in the ESD Report including the<br />
requirements of (1) in this section;<br />
iv. A copy of the letter and invoices from the GBCA to the applicant,<br />
confi rming the project is registered for Green Star Rating.<br />
Note 3: Approved DAs will have a Condition of Consent requi<strong>ring</strong> the<br />
applicant to submit to <strong>Council</strong> the GBCA Green Star Certifi cate prior to the<br />
release of the Occupation Certifi cate.<br />
BUILDING DESIGN<br />
Draft <strong>Ku</strong>-<strong>ring</strong>-<strong>gai</strong> Local Centres Development Control Plan 2012<br />