Pymble Business Park - Ku-ring-gai Council
Pymble Business Park - Ku-ring-gai Council
Pymble Business Park - Ku-ring-gai Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
5.3 BUILDING SETBACKS (CONTINUED)<br />
5<br />
Objectives<br />
Controls<br />
1 To create cohesive<br />
streetscapes with<br />
consistent building<br />
alignments and setbacks.<br />
2 To require building<br />
setbacks in appropriate<br />
locations to provide<br />
opportunities for street<br />
tree planting and front<br />
setback planting.<br />
3 To improve pedestrian<br />
accessibility and safety.<br />
4 To facilitate building<br />
modulation and<br />
articulation of building<br />
facades.<br />
1 All buildings within the <strong>Pymble</strong> <strong>Business</strong> <strong>Park</strong> must comply with the<br />
setback controls illustrated in Figure 5.3-1.<br />
2 Setbacks on properties adjacent to the Heritage Item must comply<br />
with the controls in Section 5.6 of this DCP.<br />
Building Setbacks<br />
Building setbacks stipulated in Figure 5.3-1 respond to the location within<br />
the business park. They are:<br />
i) zero setbacks to sites that are constrained or where an urban<br />
frontage would benefit the location;<br />
ii) landscaped setbacks to sites where a landscaping element<br />
within the setback is required to enhance the character of the<br />
streetscape.<br />
PYMBLE BUSINESS PARK<br />
Draft <strong>Ku</strong>-<strong>ring</strong>-<strong>gai</strong> <strong>Pymble</strong> <strong>Business</strong> <strong>Park</strong> Development Control Plan 2012<br />
p 43