ANNEXURE-I<br />
EQUIPMENT AND SERVICES TO BE FURNISHED BY CONTRACTOR<br />
AND/OR COMPANY (OIL) FOR TWO WORK OVER RIGS<br />
The equipment machinery, tools, materials supplies, instruments, services and<br />
labour, including but not limited to those listed at the following terms shall be<br />
provided at the location by OIL or Contractor and the expenses of OIL or<br />
Contractor as designated hereunder by `X‟ mark in the appropriate column ;<br />
Sl.<br />
No.<br />
I T E M At Expense of Supplied by<br />
Contractor OIL Contractor OIL<br />
I. EQUIPMENT :<br />
1. Work over Unit complete with safety, hoisting, rotating &<br />
X<br />
X<br />
maintenance equipment according to international practice.<br />
2. BOP, its attachments & spares X X<br />
3. Choke & kill unit & connections X X<br />
4. All substitute X X<br />
5. All Fishing tools & their spares X X<br />
6. a) Handling Tools for Drill pipe, Tubing, Drill Collar and other<br />
X<br />
X<br />
tubular (Elevators, Slips etc.)<br />
7. Welding set with requisite electrodes X X<br />
8. Base / Well site camp complete in all respect i.e. furniture<br />
X<br />
X<br />
fixture etc.<br />
9. Sand line X X<br />
10. Well Logging Unit & Tools & Services for Logging<br />
Operations<br />
X<br />
11. Safety equipment including fire fighting equipment X X<br />
12. Shut in valves X X<br />
13. a) Crane during well operations. Additional crane required, if<br />
any, shall be provided by Contractor at no extra cost.<br />
b) Sufficient number of vehicles for inter-location movement<br />
of rig.<br />
c) Trailer with articulated tractor<br />
d) 20 Ton crane ( Optional)<br />
(e) Truck to lift chemicals<br />
(f) Vehicle to lift bits<br />
(g) Vehicle to lift casing, tubing, well head etc<br />
14. Equipment required for supplying water as per tender<br />
specification at drilling site and camp<br />
15. Equipment required for generating electricity at the site,<br />
camp<br />
16. Rig lighting X X<br />
17. Lines / Chicksons / Fittings X X<br />
19. Mud making/ loading facilities at well site complete with<br />
X<br />
X<br />
reciprocating pumps , prime movers, hoppers tankages etc.<br />
20. Tankages inclusive of acid & water storage tanks X X<br />
21 Potable/drinking water, permanent provision at well site &<br />
X<br />
X<br />
camp<br />
22. BOP control unit X X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X