7.11 BOP CONTROL UNIT: [As per API Spec. 16D with API monogram] for<br />
each rig:<br />
One 20 gallon capacity BOP control unit with remote panel and accessories.<br />
Accumulator: 4 nos. of 5 gal capacity bladder type accumulators BOP<br />
control unit shall be complete with electrical and air operated pressurizing<br />
system, with auto pressure switch for both, capable of pressurizing up to<br />
3000 psi. BOP remote control panel with visual display to be placed near to<br />
the driller console. All electrical items should be suitable for hazardous<br />
area, zone-1 gas group IIA & IIB.<br />
NOTE: All wellhead equipment/ BOP/ BOP control unit should be pressure<br />
tested and certified as per API recommended practice.<br />
7.12 SAFETY DEVICES (for each rig):<br />
(a) Fall Protection Device: An anti-fall coupled with safety harness/<br />
belt shall be provided for personnel working on mast while exposed to<br />
a fall of 3 meters or greater or climbing unprotected vertical ladder<br />
with same exposure.<br />
(b)<br />
(c)<br />
Top man’s Escape Line & Device: For evacuation of Top Man from<br />
racking platform level in case of emergency. Escape device should<br />
have a seat and a spring actuated cam brake.<br />
Portable Gas Detectors: A portable DGMS approved gas detector<br />
capable of determining/ monitoring level of combustible gases in air<br />
should be made available at site. (Bidder should confirm to provide<br />
DGMS approved Gas Detectors in their offer. However, DGMS<br />
approval must be submitted before commencement of operation.)<br />
NOTE: All safety equipments are to be in prime working condition.<br />
7.13 General Statutory requirements for SAFETY NORMS:<br />
a. All the moving / rotating parts like belts, couplings, drive lines etc.,<br />
of the equipment should be well guarded and painted with red color.<br />
b. SRV of the pumps and air reservoir tanks should be tested regularly<br />
and records of such testing should be kept available all the times.<br />
c. Proper color codes as per safety norms should be applied on the high<br />
pressure lines, gas lines and water lines.<br />
d. Anchoring and grouting of the delivery & bleed lines of the pumps<br />
should be done before running the pump.<br />
NOTE: Any other item/ assembly not incorporated above and needed<br />
for meeting the scope of work in the tender should be provided by the<br />
Contractor.