such as Mines safety rules etc. Contractor shall take all measures<br />

reasonably necessary to provide safe working conditions and shall exercise<br />

due care & caution in preventing fire, explosion and blow out, and maintain<br />

fire-fighting and well control equipment in sound condition at all times.<br />

Contractor shall conduct such safety drills, BOP tests etc. as may be<br />

required by Company at prescribed intervals.<br />

6.9 Contractor shall assist in performing any tests to determine the<br />

productivity of any Formation encountered as may be directed by Company.<br />

Such tests and services may include, but not limited to electric logging, drill<br />

stem tests, perforation of casing, acidizing, swabbing, fracturing and acid<br />

fracturing.<br />

6.10 Depth Measurement: Contractor shall at all times be responsible for<br />

keeping accurate record of the depth while lowering any string in the hole<br />

and record such depth on tally books. OIL shall have the right at any time<br />

to check measurements of the string in any manner.<br />

6.11 The Contractor will maintain the well fluids in a manner satisfactory to the<br />

Company. The parameter of the well fluid shall be maintained by the<br />

Contractor in accordance with specifications and/or formulations set forth<br />

by the Company.<br />

6.12 In the event of any fire or blowout, Contractor shall use all reasonable<br />

means at his disposal to protect the hole and bring the said fire or blowout<br />

under Control.<br />

6.13 Adverse Weather: Contractor, in consultation with Company, shall decide<br />

when, in the face of impending adverse weather conditions, to institute<br />

precautionary measures in order to safeguard the well, the well equipment,<br />

the Work over Unit and personnel to the fullest possible extent. Contractor<br />

and Company shall each ensure that their representatives for the time<br />

being at well site, will not act unreasonably in the exercise of this clause.<br />

6.14 AMENDMENTS OF COMPLETION PROGRAMME: It is agreed that<br />

Contractor shall carry out work over operations, testing, completions,<br />

abandonment, if any, and all other operations, in accordance with the well<br />

completion programme to be furnished by OIL, which may be amended<br />

from time to time by reasonable modification as OIL deems fit, in<br />

accordance with good oil field practices.<br />

6.15 WELL POLICY: The well completion programme may vary depending on the<br />

actual requirement at and during the time of commencement of the<br />

operation. The Contractor shall be bound to obey those changes made by<br />

OIL from time to time.<br />

7.0 CONTRACTOR’S SPECIAL OBLIGATIONS<br />

7.1 It is expressly understood that Contractor is an independent Contractor<br />

and that neither it nor its employees and its sub-contractors are employees<br />

or agents of Company provided, however, Company is authorised to<br />

designate its representative, who shall at all times have access to the Workover<br />

Unit, related equipment and materials and all records, for the