04.05.2014 Views

Tender Documents - Oil India Limited

Tender Documents - Oil India Limited

Tender Documents - Oil India Limited

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(v)<br />

(vi)<br />

(vii)<br />

Approximate transportable dimension of one load should be confined<br />

to 9 M (L) x 3.5 M (W) x 3 M (H).<br />

Supply, storage, consumption / regulation of water & fuel at each<br />

well site as well as at the camp site shall be the Contractor‟s<br />

responsibility. Any shut down of operation due to non-availability of<br />

water and fuel shall be on the Contractor‟s account.<br />

Supply of LDO / LWC for mud preparation and for meeting other<br />

downhole eventualities will be the Company‟s responsibility. The<br />

Contractor shall also provide fuel for all of their vehicles and other<br />

stationary engines.<br />

(viii) All sorts of lubricants for day to day operation of various rig<br />

equipments (for each rig) shall be supplied by the Contractor. Also,<br />

various spares for rig components shall be stocked / arranged by the<br />

Contractor.<br />

(ix)<br />

(x)<br />

Well Logging Service: All logging requirements as depicted in the<br />

Work over programme will be met by OIL through its in-house or<br />

logging Contractors‟ service.<br />

Well killing: During well killing, OIL will supervise the operation, the<br />

necessary service shall be provided by the Contractor.<br />

7.6 LIGHTING SYSTEM (for each rig): Explosion proof, suitable for hazardous<br />

location with adequate lighting at all the important points. Mast lighting<br />

system and area lighting system should be provided with proper fixing<br />

arrangements, poles etc.<br />

NOTE: STATUTORY REQUIREMENTS FOR ELECTRICAL ITEMS<br />

All the equipment such as light fittings, plugs & sockets, junction boxes,<br />

etc used in hazardous area must have CMRI (INDIA) certifications or<br />

equivalent certification from competent authority from the country of origin<br />

and the bidder has to forward the same along with the offer. Bidder shall<br />

confirm categorically during the offer that approval of DGMS (INDIA) for<br />

zone I, Gas group IIA & IIB for the same will be provided before<br />

commencement of operation. The bidder should ensure that RED AVIATION<br />

WARNING LIGHTS on the crown of the mast have been provided as per<br />

Aviation Standards.<br />

7.7 OTHER EQUIPMENTS: Contractor shall provide the following for each<br />

rig:<br />

a) Rig wise Equipments:<br />

i) 3.1/2” OD Drill collars: 6 Nos.<br />

ii)<br />

Mud Motors for cement cleaning / milling of following<br />

sizes:<br />

1) 3.1/2” OD for 5.1/2” Casing (5/6 lobe configuration,<br />

minimum flow rate 70 GPM, peak torque not less than

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!