SECTION - IV<br />

SCHEDULE OF RATES<br />

The bidders must quote the following rates in their priced bids as per the<br />

format given in Proforma - B.<br />

1.0 MOBILIZATION CHARGES (ONE TIME LUMP SUM CHARGES) (M)<br />

In case the rig package is contemplated to be mobilized partly or fully from<br />

outside <strong>India</strong> then the break up of the mobilization charges to 1 st location<br />

must be furnished separately.<br />

a) Mobilization charges “M” should include mobilization of equipment<br />

and manpower for 1(one) work over rig.<br />

(Equipment includes self-propelled mobile work-over rig under<br />

Clause No. 7.1 of Section-II, well servicing pump, source water pump<br />

& pump for filter & blender unit under Clause No. 7.2 of Section-II,<br />

generating set under Clause No. 7.3 of Section-II, tankages under<br />

Clause No. 7.4 of Section-II, suction & delivery system under Clause<br />

No. 7.5 of Section-II, lighting system under Clause No. 7.6 of Section-<br />

II, other equipments under Clause No. 7.7 of Section-II, handling<br />

tools under Clause No. 7.8 of Section-II, Fishing tools under Clause<br />

No. 7.9 of Section-II, BOP under Clause No. 7.10 of Section-II, BOP<br />

Control unit under Clause No. 7.11 of section-II, Safety devices under<br />

Clause No. 7.12 of Section-II, Man power under Clause No. 7.15 L of<br />

Section-II)<br />

b) Mobilization charges should cover local and foreign costs to be<br />

incurred by the Contractors to mobilize to the first location.<br />

c) The first location will be in and around Duliajan, Assam.<br />

d) Total 2(two) work-over rigs shall be mobilized by the Contractor and<br />

accordingly mobilization charges shall be paid upon completing<br />

mobilization of each rig.<br />

NOTE: Mobilization charges “M” should not exceed 7.1/2% of TCRO (i.e.<br />

the total estimated charges for operation of each rig for 2 years).<br />

2.0 DEMOBILIZATION CHARGES (LUMP SUM) (D)<br />

For each rig package from last drilling location<br />

a) Demobilization charges “D” should include demobilization of all<br />

equipment and manpower attached with 1(one) work-over rig.<br />

(Equipment includes self-propelled mobile work-over rig under clause<br />

No. 7.1 of Section-II, well servicing pump, source water pump &<br />

pump for filter & blender unit under Clause No. 7.2 of Section-II,<br />

generating set under Clause No. 7.3 of Section-II, tankages under<br />

Clause No. 7.4 of Section-II, suction & delivery system under Clause<br />

No. 7.5 of Section-II, lighting system under Clause No. 7.6 of Section-<br />

II, other equipments under Clause No. 7.7 of Section-II, handling