Tender Documents - Oil India Limited
Tender Documents - Oil India Limited
Tender Documents - Oil India Limited
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
v) One ambulance with dedicated driver shall be kept standby<br />
at well site for 24 hrs. to meet any emergency with all basic<br />
facilities like stretchers, oxygen cylinders, first aid facilities, etc.<br />
G. CIVIL WORK INVOLVEMENT<br />
i) OIL’S RESPONSIBILITY<br />
1. Company shall provide foundation for the standard rig<br />
equipment including hard standing and cement concreting<br />
areas, effluent pit provision etc.<br />
2. Digging of pilot pit & strengthening of effluent pit<br />
3. Maintenance and construction of approach road during<br />
operation also when the new or next well is allocated.<br />
4. Maintenance of plinth including preparation of proper drainage<br />
system as per OIL‟s standard to evacuate rain water and mud<br />
sludge etc. to effluent pit. Regular jobs at plinth i.e. cutting of<br />
small drains/nallah leading to pit, leveling of plinth with<br />
Company‟s civil materials, shall be done by Company.<br />
5. To provide toilets, both for Contractor‟s personnel and<br />
Company‟s personnel including supply of all the required<br />
materials and subsequent dismantling after completion of the<br />
well.<br />
6. Sand bagging of adjacent wells. Company shall provide the<br />
appropriate barrier of sand bags to the adjacent live wells,<br />
located in the same plinth.<br />
7. Enclosure to stop spillage of LWC, HSD etc. in the respective<br />
tanks.<br />
ii) CONTRACTOR’S RESPONSIBILITY<br />
1) To provide tube wells both for drinking as well as source water.<br />
The digging of deep tube wells at the respective sites and<br />
installation / operation of water pumps, extraction of water<br />
from deep tube wells for rigs as well as camp shall be the<br />
Contractor‟s responsibility. However, for the sake of the<br />
Contractor‟s knowledge, the depth of deep tube well in the<br />
region will be approximately 15-50 m (with double filter<br />
installed). Supply of water from alternate sources shall be the<br />
responsibility of the Contractor, if no water is found at the<br />
exact camp or well site.<br />
2) Construction of all types of sheds required during operation i.e.<br />
Telephone shed, strong sheds over mud tank and chemical<br />
storage etc, including supply of all the required materials and<br />
subsequent dismantling after completion of the well.<br />
3) All grouting required for anchoring guy post & delivery lines<br />
including Cement and other civil materials.