04.05.2014 Views

Tender Documents - Oil India Limited

Tender Documents - Oil India Limited

Tender Documents - Oil India Limited

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

v) One ambulance with dedicated driver shall be kept standby<br />

at well site for 24 hrs. to meet any emergency with all basic<br />

facilities like stretchers, oxygen cylinders, first aid facilities, etc.<br />

G. CIVIL WORK INVOLVEMENT<br />

i) OIL’S RESPONSIBILITY<br />

1. Company shall provide foundation for the standard rig<br />

equipment including hard standing and cement concreting<br />

areas, effluent pit provision etc.<br />

2. Digging of pilot pit & strengthening of effluent pit<br />

3. Maintenance and construction of approach road during<br />

operation also when the new or next well is allocated.<br />

4. Maintenance of plinth including preparation of proper drainage<br />

system as per OIL‟s standard to evacuate rain water and mud<br />

sludge etc. to effluent pit. Regular jobs at plinth i.e. cutting of<br />

small drains/nallah leading to pit, leveling of plinth with<br />

Company‟s civil materials, shall be done by Company.<br />

5. To provide toilets, both for Contractor‟s personnel and<br />

Company‟s personnel including supply of all the required<br />

materials and subsequent dismantling after completion of the<br />

well.<br />

6. Sand bagging of adjacent wells. Company shall provide the<br />

appropriate barrier of sand bags to the adjacent live wells,<br />

located in the same plinth.<br />

7. Enclosure to stop spillage of LWC, HSD etc. in the respective<br />

tanks.<br />

ii) CONTRACTOR’S RESPONSIBILITY<br />

1) To provide tube wells both for drinking as well as source water.<br />

The digging of deep tube wells at the respective sites and<br />

installation / operation of water pumps, extraction of water<br />

from deep tube wells for rigs as well as camp shall be the<br />

Contractor‟s responsibility. However, for the sake of the<br />

Contractor‟s knowledge, the depth of deep tube well in the<br />

region will be approximately 15-50 m (with double filter<br />

installed). Supply of water from alternate sources shall be the<br />

responsibility of the Contractor, if no water is found at the<br />

exact camp or well site.<br />

2) Construction of all types of sheds required during operation i.e.<br />

Telephone shed, strong sheds over mud tank and chemical<br />

storage etc, including supply of all the required materials and<br />

subsequent dismantling after completion of the well.<br />

3) All grouting required for anchoring guy post & delivery lines<br />

including Cement and other civil materials.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!