7. To measure the flow rate and to analyze the produced fluid as<br />

and when required.<br />

8. To maintain the tubing tally including any down hole<br />

production equipment run.<br />

9. All necessary surface connections to be made by the Contractor<br />

for enlivening of the wells using nitrogen pumping unit. Crane<br />

services to be provided by OIL in case any CTU operation is<br />

carried out. However, in case OIL advised the Contractor to<br />

mobilize the Crane, the services required during CTU operation<br />

is to be provided by Contractor.<br />

10. Hooking up of the steam lines to production tanks and steam<br />

jacket.<br />

ii) Schedule -2<br />

1. All production equipment's namely X-Mas tree, Tubing head<br />

spool, Hanger flange / Tubing hanger, Separators with all<br />

accessories, Tanks, Steam jacket, Ground X-Mas tree, Tubings<br />

(both EUE and VAM), Pipes for surface fittings and flare line etc.<br />

will be provided by OIL‟s Production <strong>Oil</strong> Department.<br />

2. All tools required for making up of the above equipments are to<br />

be supplied by the Contractor i.e. Elevators, slips, Tubing tong,<br />

Coupling tong, Hydraulic pumps and other necessary<br />

equipment's for hydraulic testing of the separators, X-Mas tree,<br />

Ground X-Mas tree, Steam Jacket etc to be provide by the<br />

Contractor.<br />

3. Consumables such as thread dopes to be provided by the<br />

Contractor.<br />

C. TRANSPORTATION SERVICES<br />

i) OIL’S RESPONSIBILITY<br />

1) Transportation of Company‟s personnel and materials/<br />

Equipment (those not attached with the rig) will be Company‟s<br />

responsibility.<br />

2) Cement shall be supplied by OIL. To & fro collection,<br />

transportation, loading / unloading, stacking etc of these cement<br />

shall be carried out by OIL, as and when required.<br />

3) In case of well emergency, it is the responsibility of OIL to<br />

supply/ transport Chemicals, Cement etc. to well site.<br />

4) Well consumables like casing, tubing, well head etc. shall be<br />

supplied by OIL. „To‟ & „fro‟ collection, transportation including<br />

loading/unloading, stacking etc. at well site of these<br />

consumables will be provided by OIL.