- Page 1 and 2:
Oil India Limited CONTRACTS DEPARTM
- Page 3 and 4:
Head-Contracts, Oil India Ltd., P.O
- Page 5 and 6:
7.0 OIL now looks forward to your a
- Page 7 and 8:
4.0 AMENDMENT OF BID DOCUMENTS: 4.1
- Page 9 and 10:
i) Any Nationalised / scheduled Ban
- Page 11 and 12:
other accompanying documents except
- Page 13 and 14:
19.0 MODIFICATION AND WITHDRAWAL OF
- Page 15 and 16:
22.2 The Priced bids of the unsucce
- Page 17 and 18:
of requisite value, as per Indian S
- Page 19 and 20:
No request will be considered for c
- Page 21 and 22:
1.2 The horsepower rating of the ri
- Page 23 and 24:
7.0 DOCUMENTS: Bidders must furnish
- Page 25 and 26:
2.0 To ascertain the substantial re
- Page 27 and 28:
NOTE: The above items are defined i
- Page 29 and 30:
SECTION - I GENERAL CONDITIONS OF C
- Page 31 and 32:
such personnel with personnel accep
- Page 33 and 34:
9.0 INSURANCE: 9.1 The Contractor s
- Page 35 and 36:
12.0 TERMINATION: 12.1 TERMINATION
- Page 37 and 38:
of the services and by the rules &
- Page 39 and 40:
equipment and/or loss or damage to
- Page 41 and 42:
herein, shall be limited to Company
- Page 43 and 44:
29.0 SUBSEQUENTLY ENACTED LAWS: Sub
- Page 45 and 46:
(a) Minimum width of the well site
- Page 47 and 48:
Sheaves for catline, sandline, shea
- Page 49 and 50:
Draw Works. The Transmission should
- Page 51 and 52:
(v) (vi) (vii) Approximate transpor
- Page 53 and 54:
) OTHER ITEMS: i) Skid Mounted Well
- Page 55 and 56:
(d) (e) Junk subs 1. One (1) no. su
- Page 57 and 58:
7.14 ADDITIONAL ITEMS: The followin
- Page 59 and 60:
including their recommended dosage
- Page 61 and 62:
5) Any additional requirement of cr
- Page 63 and 64: 5. Proper insulation mat should be
- Page 65 and 66: v) One ambulance with dedicated dri
- Page 67 and 68: Sl. No. Key Personnel Number per lo
- Page 69 and 70: Duties & responsibilities include s
- Page 71 and 72: manpower deployed by the Contractor
- Page 73 and 74: 1.13 “Facility” means and inclu
- Page 75 and 76: 3.4 Contractor’s Personnel: Contr
- Page 77 and 78: such as Mines safety rules etc. Con
- Page 79 and 80: c) WELL COMPLETION/WELL ABANDONMENT
- Page 81 and 82: In case, no demobilization charges
- Page 83 and 84: of this contract and shall indemnif
- Page 85 and 86: shall furnish an Undertaking simila
- Page 87 and 88: e) Contractor fails to meet any of
- Page 89 and 90: interests, the Company shall notify
- Page 91 and 92: d. The contractor shall provide a c
- Page 93 and 94: submit comprehensive HSE manual & p
- Page 95 and 96: tools under Clause No. 7.8 of Secti
- Page 97 and 98: . Payment towards force majeure day
- Page 99 and 100: The Standby day rate will be payabl
- Page 101 and 102: Section 2 - Commitments of the Bidd
- Page 103 and 104: Section 6 - Equal treatment of all
- Page 105 and 106: APPENDIX - 1 Date : ________ WORK-O
- Page 107 and 108: trailer mounted / Ext propelled. ii
- Page 109 and 110: Make : Model: Capacity in MT: 4.6 S
- Page 111 and 112: Sl. No. I T E M At Expense of Suppl
- Page 113: Sl. No. I T E M At Expense of Suppl
- Page 117 and 118: ANNEXURE - IV Details of all cables
- Page 119 and 120: PROFORMA-A LIST OF ITEMS (Equipment
- Page 121 and 122: 4 Standby Charge Day 365 d.4 D.4= d
- Page 123 and 124: PROFORMA-D STATEMENT OF NON-COMPLIA
- Page 125 and 126: PROFORMA - F FORM OF PERFORMANCE BA
- Page 127 and 128: 3. In consideration of the payments
- Page 129: AUTHORISATION FOR ATTENDING BID OPE