04.05.2014 Views

Tender Documents - Oil India Limited

Tender Documents - Oil India Limited

Tender Documents - Oil India Limited

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4) Training Courses :<br />

The Contractor shall ensure that all of the Contractor Personnel<br />

performing services hereunder shall have attended all safety and<br />

operational training courses such as mines vocational training etc.<br />

required by applicable law and as is generally consistent with<br />

international petroleum industry practice and/or as otherwise<br />

required by the Company. MVT training can be imparted by OIL to<br />

contractor’s personnel on chargeable basis subject to availability<br />

and prior confirmation from OIL.<br />

<br />

The Contractor shall, if requested, forthwith produce valid and<br />

current certificates of completion or attendance for the<br />

Company‟s inspection.<br />

5) Personnel should be well verged in fire fighting, BOP control, gas<br />

testing etc. The appropriate certificates to this effect, issued by<br />

ONGCL/OIL or any other organization, also should be submitted<br />

prior to mobilization.<br />

(In case, the above training course for Contractor‟s personnel is to be<br />

arranged by OIL, the Contractor will be charged accordingly).<br />

6) Rig Manager shall be stationed at base office. In case of operational<br />

requirement he shall visit well sites and can leave station only on<br />

specific permission of OIL.<br />

7) Contractor should deploy other personnel at rig site, which shall<br />

include drivers, Rig fitters, carpenters warehouse personnel, security<br />

men, (both at well site and camp site), power tong operator, services<br />

of unskilled labour as and when required for following multiple jobs.<br />

<br />

<br />

<br />

<br />

Chemical Helper<br />

Engineering helper (Additional)<br />

Electrical helper<br />

Persons on rack during casing job.<br />

All skilled / semi skilled workman involved in carrying out electrical<br />

jobs should have valid electrical wireman permit issued by state<br />

licensing board.<br />

8) On/off duty details of rig and associated service personnel should be<br />

indicated.<br />

9) Employment of personnel other than key persons shall be at the<br />

discretion of the Contractor to run all operations at well site and<br />

camp successfully.<br />

10) The Contractor shall forward the list of personnel deployed in each<br />

Rig along with bio-data / qualification/ experience / track record of<br />

the personnel prior to mobilization of the Rigs with all supporting<br />

documents including their recent photographs. Any additional

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!