heavy motor vehicle. The bio data of Crane Operator should be<br />

furnished along with the technical bid in format shown in<br />

Annexure – II).<br />

2. Working hours of the Crane Operator: 12 Hrs (i.e. During<br />

General shift and as and when required). Bidder to confirm<br />

while quoting.<br />

d. Light Duty Truck - One for two rigs: One (1) light duty truck having<br />

GVW of at least 11 Ton with jugalis is to be provided for<br />

transportation of Bits, Mills, light consumables, chemicals, etc. from<br />

Company‟s yard/Godown. Loading/ Unloading is to be carried out by<br />

the Contractor.<br />

e. Well Site Mud Plant (One Set for Two Rigs): One centrally located<br />

mud plant for two (2) rigs operation shall be provided, maintained &<br />

managed by the contractor. The mud plant will be erected within the<br />

well site where it is required. The following are the requirements for<br />

the mud plant.<br />

1. Water storage tank: One (1) no. 250 bbl capacity.<br />

2. Mud storage tanks: Two (2) nos. 400 bbl capacity each (total<br />

capacity 400 bbl).<br />

3. Mud Agitators: All the mud storage tanks shall be equipped<br />

with sufficient nos. of Electric motor driven agitators so that<br />

the mud does not get settled down.<br />

4. A mud preparing / loading pump set (reciprocating or<br />

centrifugal), diesel engine / electric motor driven, having<br />

discharge capacity of 350 GPM.<br />

5. A source water pump set for collecting water requirement for<br />

preparation of mud.<br />

6. A diesel generating set of required capacity to run all the<br />

electrical appliances and for illumination of the mud plant.<br />

7. All necessary pipes, fittings, valves, etc. to erect the mud plant.<br />

f. Standard Mud Testing Laboratory (One for two Rigs): One (1)<br />

standard mud testing laboratory for two rigs shall be provided by the<br />

contractor. The mud testing laboratory should have the requisite<br />

mud testing equipment including but not limited to Mud balance,<br />

Fann Viscometer, API fluid loss apparatus with dead weight tester,<br />

PH meter, Salinity measurement, etc. along with the laboratory &<br />

necessary mud testing equipment / apparatus etc.<br />

GENERAL NOTE FOR ADDITIONAL ITEMS: OIL shall have the option to<br />

advise mobilization of goods/services covered under Clause No. 7.14(a),<br />

7.14(e) & 7.14(f) above along with the Rig packages or at a later date by<br />

giving 60 days written notice.<br />

7.15 OTHER SERVICES TO BE PROVIDED FOR EACH RIG OPERATION<br />

A. MUD ENGINEERING SERVICES<br />

(i) OIL shall provide a mud/ workover fluid programme based on<br />

the depth data/casing policy as indicated in this document