- Page 1 and 2: Oil India Limited CONTRACTS DEPARTM
- Page 3: Head-Contracts, Oil India Ltd., P.O
- Page 7 and 8: 4.0 AMENDMENT OF BID DOCUMENTS: 4.1
- Page 9 and 10: i) Any Nationalised / scheduled Ban
- Page 11 and 12: other accompanying documents except
- Page 13 and 14: 19.0 MODIFICATION AND WITHDRAWAL OF
- Page 15 and 16: 22.2 The Priced bids of the unsucce
- Page 17 and 18: of requisite value, as per Indian S
- Page 19 and 20: No request will be considered for c
- Page 21 and 22: 1.2 The horsepower rating of the ri
- Page 23 and 24: 7.0 DOCUMENTS: Bidders must furnish
- Page 25 and 26: 2.0 To ascertain the substantial re
- Page 27 and 28: NOTE: The above items are defined i
- Page 29 and 30: SECTION - I GENERAL CONDITIONS OF C
- Page 31 and 32: such personnel with personnel accep
- Page 33 and 34: 9.0 INSURANCE: 9.1 The Contractor s
- Page 35 and 36: 12.0 TERMINATION: 12.1 TERMINATION
- Page 37 and 38: of the services and by the rules &
- Page 39 and 40: equipment and/or loss or damage to
- Page 41 and 42: herein, shall be limited to Company
- Page 43 and 44: 29.0 SUBSEQUENTLY ENACTED LAWS: Sub
- Page 45 and 46: (a) Minimum width of the well site
- Page 47 and 48: Sheaves for catline, sandline, shea
- Page 49 and 50: Draw Works. The Transmission should
- Page 51 and 52: (v) (vi) (vii) Approximate transpor
- Page 53 and 54: ) OTHER ITEMS: i) Skid Mounted Well
- Page 55 and 56:
(d) (e) Junk subs 1. One (1) no. su
- Page 57 and 58:
7.14 ADDITIONAL ITEMS: The followin
- Page 59 and 60:
including their recommended dosage
- Page 61 and 62:
5) Any additional requirement of cr
- Page 63 and 64:
5. Proper insulation mat should be
- Page 65 and 66:
v) One ambulance with dedicated dri
- Page 67 and 68:
Sl. No. Key Personnel Number per lo
- Page 69 and 70:
Duties & responsibilities include s
- Page 71 and 72:
manpower deployed by the Contractor
- Page 73 and 74:
1.13 “Facility” means and inclu
- Page 75 and 76:
3.4 Contractor’s Personnel: Contr
- Page 77 and 78:
such as Mines safety rules etc. Con
- Page 79 and 80:
c) WELL COMPLETION/WELL ABANDONMENT
- Page 81 and 82:
In case, no demobilization charges
- Page 83 and 84:
of this contract and shall indemnif
- Page 85 and 86:
shall furnish an Undertaking simila
- Page 87 and 88:
e) Contractor fails to meet any of
- Page 89 and 90:
interests, the Company shall notify
- Page 91 and 92:
d. The contractor shall provide a c
- Page 93 and 94:
submit comprehensive HSE manual & p
- Page 95 and 96:
tools under Clause No. 7.8 of Secti
- Page 97 and 98:
. Payment towards force majeure day
- Page 99 and 100:
The Standby day rate will be payabl
- Page 101 and 102:
Section 2 - Commitments of the Bidd
- Page 103 and 104:
Section 6 - Equal treatment of all
- Page 105 and 106:
APPENDIX - 1 Date : ________ WORK-O
- Page 107 and 108:
trailer mounted / Ext propelled. ii
- Page 109 and 110:
Make : Model: Capacity in MT: 4.6 S
- Page 111 and 112:
Sl. No. I T E M At Expense of Suppl
- Page 113 and 114:
Sl. No. I T E M At Expense of Suppl
- Page 115 and 116:
ANNEXURE-II PROFORMA FOR BIO DATA O
- Page 117 and 118:
ANNEXURE - IV Details of all cables
- Page 119 and 120:
PROFORMA-A LIST OF ITEMS (Equipment
- Page 121 and 122:
4 Standby Charge Day 365 d.4 D.4= d
- Page 123 and 124:
PROFORMA-D STATEMENT OF NON-COMPLIA
- Page 125 and 126:
PROFORMA - F FORM OF PERFORMANCE BA
- Page 127 and 128:
3. In consideration of the payments
- Page 129:
AUTHORISATION FOR ATTENDING BID OPE