SECTION - III<br />

SPECIAL CONDITIONS OF CONTRACT<br />

1.0 DEFINITIONS: Following terms and expression shall have the meaning<br />

hereby assigned to them unless the context otherwise requires:<br />

1.1 „Work over Unit‟ means workover rig complete with pumps, power packs,<br />

and other accessories and equipment as listed in the Contract.<br />

1.2 “Associated services” means equipment and services, asked for, along with<br />

work over unit in this bid document. These include but not limited to mud<br />

engineering, equipment & services; camp/catering/ medical services,<br />

communication, safety & fire fighting services well control services etc.<br />

1.3 “Operating Area” means those areas in onshore <strong>India</strong> in which Company or<br />

its affiliated Company may from time to time be entitled to conduct drilling<br />

operations.<br />

1.4 “Operation Base” means the place or places, onshore, designated as such<br />

by Company from time to time.<br />

1.5 “Site” means the land and other places, on/under/in or through which the<br />

works are to be executed by the Contractor and any other land and places<br />

provided by the Company for working space or any other purpose as<br />

designated hereinafter as forming part of the Site.<br />

1.6 “Company‟s items” means the equipment, materials and services, which are<br />

to be provided by Company at the expense of Company.<br />

1.7 “Contractor‟s items” means the equipment; materials and services, which<br />

are to be provided by Contractor or Company at the expense of the<br />

Contractor which, are listed in section under terms of reference and<br />

technical specifications.<br />

1.8 “Commencement Date” means the date on which the Contractor<br />

commenced the work over operation at the first well under this contract.<br />

1.9 “Contractor‟s personnel” means the personnel as mentioned under section<br />

terms of reference and technical specification, to be provided by Contractor<br />

from time to time to conduct operations hereunder.<br />

1.10 “Contractor‟s representatives” means such persons duly appointed by the<br />

Contractor thereof at site to act on Contractor‟s behalf and notified in<br />

writing to the Company.<br />

1.11 “Day” means a calendar day of twenty-four (24) consecutive hours<br />

beginning at 06:00 hrs. and ending at 06:00 hrs.<br />

1.12 “Approval” as it relates to Company, means written approval.