5. Proper insulation mat should be placed in front of switch, panel<br />

board etc.<br />

6. Should have FLP torch, Insulation Tester, Multimeter, Earth<br />

Tester and Electrician‟s Tool Kit.<br />

7. Job supervision has to be done by a competent person,<br />

possessing supervisor‟s certificate of competency (part no. VIII)<br />

issued / endorsed by state licensing board of Assam.<br />

v) COMMISSIONIG REPORT & STATUTORY RECORDS: One<br />

commissioning and statutory record register should be maintained by<br />

Contractor to record the following-<br />

Insulation resistance of all motors, generators, cables,<br />

distribution board, transformer etc. (in each rig up & monthly).<br />

Earth resistance of all electrodes. (in each rig up & monthly).<br />

Test record of RCCBs (monthly).<br />

Maintenance of FLP equipments (yearly).<br />

Electrical Log sheet (daily), Annexure – XII (Format of Annexure<br />

– XII of IER will be provided by OIL.<br />

E. CEMENTING SERVICES<br />

i) OIL shall perform the cementation jobs such as Squeeze<br />

cementation, Cement plug job etc. as per the requirement of well<br />

completion policy at the wells planned for work over jobs. The<br />

Contractor shall provide the necessary tools, equipment and<br />

services of personnel to enable OIL to carry out the jobs<br />

successfully. Contractor‟s pump shall be used to pump cement<br />

slurry. Expected parameters are 2500 psi, (max.)<br />

ii)<br />

iii)<br />

iv)<br />

The Contractor shall be required to assist OIL in performing all<br />

secondary cementation jobs at all the wells.<br />

<strong>Oil</strong> may at any time decide to utilise a cementing unit for<br />

carrying out the cementation job. Further the Contractor will<br />

carry out cleaning / flushing of cementing unit and associated<br />

surface lines after completion of the cementing jobs.<br />

During cementation readiness: The Contractor shall, during<br />

the cementing job, attend to all problems, render help and rectify<br />

all defects to the satisfaction of OIL‟s cementing Engineer. These<br />

shall include equipment and accessories supplied by OIL also.<br />

v) Post Cementation follow up action: The Contractor shall carry<br />

out cleaning and flushing to remove all traces of cement from<br />

unwanted locations. They shall also disassemble and<br />

remove/load all OIL‟s equipment, which are required to be<br />

removed after the mandatory period.