c) WELL COMPLETION/WELL ABANDONMENT: After completion of a<br />

well successfully, Contractor will provide the completion report of the<br />

well with all information and events including above-mentioned<br />

information. In case of abandonment of a well, abandonment report,<br />

in addition to above, will be provided by the Contractor in Company‟s<br />

prescribed format or as per requirement.<br />

7.4 CONFIDENTIALITY OF INFORMATION: All information obtained by<br />

Contractor in the conduct of operations hereunder, including but not<br />

limited to, depth, formations penetrated, testing, surveying etc. shall be<br />

considered confidential and shall not be divulged by Contractor or its<br />

employees to any one other than Company‟s representative. This obligation<br />

of Contractor shall be in force even after the termination of the Contract.<br />

7.5 Contractor shall carryout normal maintenance of Company‟s items at well<br />

site excepting for those items which Contractor is not qualified to, or<br />

cannot maintain or repair, with its normal complement of personnel and<br />

equipment.<br />

7.6 Contractor should provide the list of items to be imported in the format<br />

specified in Proforma-A for issuance of recommendatory letter to<br />

Directorate General of Hydrocarbons (DGH), New Delhi for clearance of<br />

goods from <strong>India</strong>n customs at concessional (nil) rate of customs duty.<br />

7.7 Contractor shall arrange for inland transportation of all equipment, etc.<br />

from the port to the place of work and back at the end of the work at their<br />

own expense. Arrangement of Road Permits and payment of Assam Entry<br />

Tax for bringing Contractor‟s equipment/material to Work place shall be<br />

Contractor‟s responsibility.<br />

7.8 In case the Contractor imports the equipment etc. on re-export basis, the<br />

Contractor shall ensure re-export of the equipment and all consumables<br />

and spares (except those consumed during the contract period) and<br />

complete all documentation required. Company will issue necessary<br />

certificates etc. as required. The Contractor should arrange re-export of<br />

equipment within 60 days of notice of demobilization issued by the<br />

Company. If the re-export is not completed within the specified period,<br />

customs duty, penalty etc. levied by customs authorities for such delay<br />

shall be to Contractor's account and same will be deducted by the<br />

Company from Contractor's bills and security deposit.<br />

8.1 COMPANY’S SPECIAL OBLIGATIONS<br />

8.2 Company shall at its cost, provide items and services as shown in this<br />

document.<br />

8.3 Company shall be responsible at its cost, for maintaining adequate stock<br />

levels of its items and replenishing the same as deemed necessary, unless<br />

specified to the contrary elsewhere in the contract.<br />

8.4 Ingress and Egress at location: Company shall provide Contractor<br />

requisite certificates for obtaining rights of ingress to egress from the<br />

locations, where operations are to be carried out, including any certificate