Tender Documents - Oil India Limited
Tender Documents - Oil India Limited
Tender Documents - Oil India Limited
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Demobilization charges include demobilization of “Crane” under Clause No.<br />
7.14(c) of Section-II.<br />
The monthly operational / rental charges which includes the crane<br />
operator / crew charges for round the clock duty and will be payable from<br />
the time the Rig is rigged up and made ready for killing the well, until the<br />
contract is expired / terminated / cancelled but subject to following:<br />
Proportionate monthly operational / rental charges will be payable for<br />
part month.<br />
No monthly operational / rental charges will be payable for the period<br />
the “Crane” remains out of order or is not in working condition.<br />
The running charges are payable for moving of crane from one working site<br />
to another but not for movement of crane within in the surrounding of a<br />
working well site.<br />
D. Light Duty Truck - One No. for two rigs<br />
Mobilization charges include mobilization of “Light Duty Truck” under<br />
Clause No. 7.14(d) of Section-II.<br />
Demobilization charges include demobilization of “Light Duty Truck” under<br />
Clause No. 7.14(d) of Section-II.<br />
The monthly operational / rental charges which includes the jugalis / crew<br />
charges for round the clock duty and will be payable from the time the Rig<br />
is rigged up and made ready for killing the well, until the contract is<br />
expired / terminated / cancelled but subject to following:<br />
Proportionate monthly operational / rental charges will be payable for<br />
part month.<br />
No monthly operational / rental charges will be payable for the period<br />
the “Light Duty Truck” remains out of order or is not in working<br />
condition.<br />
The running charges are payable for the Kilometer run in a calendar month<br />
based on the daily log sheet signed by OIL‟s representative.<br />
E. Well Site Mud Plant – One Set for Two Rigs<br />
Mobilization charges include mobilization of “Well Site Mud Plant” under<br />
Clause No. 7.14(e) of Section-II.<br />
Demobilization charges include demobilization of “Well Site Mud Plant”<br />
under Clause No. 7.14(e) of Section-II.<br />
The operating day rate will become payable on 24 hrs. Day basis from the<br />
time any mud is prepared until the mud preparation job is over. This needs<br />
to be certified by OIL‟s representative.