16.05.2014 Views

Targets IMage Energy Regional (TIMER) Model, Technical ...

Targets IMage Energy Regional (TIMER) Model, Technical ...

Targets IMage Energy Regional (TIMER) Model, Technical ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RIVM report 461502024 page 107 of 188<br />

30<br />

25<br />

<br />

-<br />

*<br />

Ç 20<br />

6<br />

Ã8<br />

WV<br />

V<br />

R 15<br />

ÃF<br />

Q<br />

WLR<br />

F<br />

X<br />

G 10<br />

UR<br />

3<br />

5<br />

0<br />

Middle<br />

East<br />

China<br />

West.<br />

Europe<br />

CIS<br />

USA<br />

Central<br />

Am.<br />

0 10000 20000 30000 40000 50000 60000<br />

&XPXODWLYHÃ5HVRXUFHÃ(-<br />

Oceania<br />

Canada<br />

South Am.<br />

Canada<br />

USA<br />

Central America<br />

South America<br />

North Africa<br />

West Africa<br />

East Africa<br />

South Africa<br />

Western Europe<br />

Central Europe<br />

CIS<br />

West Asia<br />

South Asia<br />

East Asia<br />

South East Asia<br />

Oceania<br />

Japan<br />

)LJXUH$VVXPHGUHJLRQDOJDVVXSSO\FRVWFXUYHH[SUHVVHGDVWKHIDFWRUZLWKZKLFKWKH<br />

&DSLWDOB2XWSXW5DWLRLVPXOWLSOLHGRQGHSOHWLRQ<br />

*DVSURGXFWLRQ<br />

Similar to oil, we use for the natural gas supply parameter estimates from several previous<br />

analyses. Some parameters are constant and the same for all regions:<br />

• the Desired Gross Margin (20%),<br />

• the discount/interest rate (10%),<br />

• the technical life time of capital stocks (15 years),<br />

• the economic life time of capital stocks (5 years),<br />

• the technically maximum rate at which reserves can be exploited (15%),<br />

• the Desired Reserve Production rate (30 years).<br />

Other parameters are region-specific as indicated in 7DEOH.<br />

%*)VXSSO\.<br />

The BGF-formulation is similar to the one for BLF, with a number of parameters constant and<br />

equal for all regions. BLF and BGF are each having their own cost determinants, such as<br />

learning behaviour. However, the depletion curves are for BLF and BGF together, that is, we<br />

use the sum of BLF and BGF production to estimate the yield decrease which is then applied to<br />

both. All parameters have been set equal to those of BLF, with two main exceptions:<br />

• the Capital-Output-Ratio for upgrading biomass into bio-gaseous fuels is slightly lower (65<br />

US$/GJ);<br />

• there have been introduced no historically forced market shares / demonstration projects as<br />

for BLF.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!