22.10.2014 Views

VL2000 ug finalcomp.book - Kodak

VL2000 ug finalcomp.book - Kodak

VL2000 ug finalcomp.book - Kodak

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 3<br />

Controller Set or adjust dryer temperature As needed 1 min<br />

Controller Set or adjust web speed As needed 1 min<br />

Controller Setup and adjust page correlation system As needed 15 min<br />

Controller Assign logical printers Job<br />

2 min<br />

dependent<br />

Controller Clean cabinet Weekly 5 min<br />

per<br />

Controlle<br />

r cabinet<br />

Dryer Clean (vacuum out paper dust, wipe ink Monthly 10 min<br />

off of dryer drum, etc.)<br />

Folder “Clean the Cue Sensor Lenses” on page Monthly<br />

297<br />

Print<br />

stations<br />

Acknowledge status and error messages As needed 5 min<br />

Print<br />

stations<br />

Print<br />

stations<br />

Print<br />

stations<br />

Print<br />

Stations<br />

Print Tower<br />

Remove waste container and dispose of<br />

waste<br />

Replenish fluids<br />

As needed<br />

As needed.<br />

(Check at<br />

beginning<br />

and end of<br />

each shift<br />

15 min<br />

10 min<br />

Clean print station exterior Weekly 30 min<br />

“Perform Print Station Maintenance” on<br />

page 299<br />

“Replace the Web Cleaner Pre-Filters” on<br />

page 299<br />

Print Tower Setup and adjust line hole cueing system As needed 15 min<br />

Print Tower “Clean the Cue Sensor Lenses” on page Monthly<br />

297<br />

Print Tower “Clean the Web Cleaner Internal Monthly<br />

Components” on page 297<br />

Print Tower “Clean and Check the Indicator Lamps” Quarterly<br />

on page 299<br />

Printheads Recognize and correct print quality As needed 15 min<br />

problems<br />

Printheads Adjust printhead position As needed, at<br />

printhead<br />

replacement<br />

10 min<br />

Printheads Verify print quality Continuously<br />

while printing<br />

thro<strong>ug</strong>hout<br />

the shift<br />

Rewind<br />

Rewind<br />

Rewind<br />

Unit<br />

System<br />

Sample operator responsibilities, <strong>VL2000</strong> (Continued)<br />

Module Task Frequency<br />

“Clean and Check the Air Shafts” on<br />

page 299<br />

“Clean and Check the Indicator Lamps”<br />

on page 299<br />

“Perform Rewind Unit Maintenance” on<br />

page 299<br />

“Check the Operation and Safety” on<br />

page 299<br />

Quarterly<br />

Quarterly<br />

Time<br />

required<br />

N/A<br />

294 KODAK VERSAMARK <strong>VL2000</strong> Printing System

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!