22.10.2014 Views

VL2000 ug finalcomp.book - Kodak

VL2000 ug finalcomp.book - Kodak

VL2000 ug finalcomp.book - Kodak

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rewind Unit<br />

External Power and Air Connections.<br />

Figure 25<br />

Rewind unit air pressure controls<br />

The rewind unit has one pressure regulator and an air switch located<br />

behind the upper gear side cover. The unit comes supplied with an<br />

internal air compressor, and can be connected to facility supplied air<br />

pressure if needed. The inlet pressure regulator should be set to<br />

approximately 0.65 KPa (94 PSI).<br />

Figure 26<br />

S-wrap bar and guides<br />

The rewind unit uses an S-wrap bar to set substrate tension. The<br />

substrate is webbed thro<strong>ug</strong>h the bar. If the rewind roll has signs of<br />

cupping or dishing, the S-wrap bar should be rotated to increase or<br />

decrease tension on the running web. There are two locking rings (one at<br />

each end) that are used to rotate the S-wrap bar to decrease tension. In<br />

addition, the guides should be positioned so they guide the running web<br />

and keep it in the correct position.<br />

Operator’s Guide 63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!