Precipitator Optimization System User Manual - Neundorfer, Inc.
Precipitator Optimization System User Manual - Neundorfer, Inc.
Precipitator Optimization System User Manual - Neundorfer, Inc.
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Precipitator</strong> <strong>Optimization</strong> <strong>System</strong> 7<br />
<strong>User</strong> <strong>Manual</strong><br />
program to begin advancing through the steps. The Abort input is used to abort the start up or<br />
shut down process. The Final Step input will cause the program to advance to the last step and<br />
then terminate.<br />
The step edit section is where the actual steps of a program are created and edited. Pressing<br />
the insert step button will add new steps to the program. The initial parameters used will be the<br />
halfway point between the step prior to and after the step just entered. For example, if the prior<br />
step has a value of 10 and the following step has a value of 20. Then the new step would have a<br />
value of 15 for that parameter. During a start up program, if step one does not contain any<br />
voltage controls, then all controls will remain off until step 2 becomes true. If step 1 does contain<br />
voltage controls then those controls will turn on immediately upon the start of a start up program.<br />
To change the parameters of step, highlight the step and press the step edit button.<br />
Copyright © 2007 <strong>Neundorfer</strong>, <strong>Inc</strong>orporated<br />
Specifications and Features subject to change without notice<br />
08/01/07<br />
78