01.12.2014 Views

agenda city of watsonville city council/redevelopment agency meeting

agenda city of watsonville city council/redevelopment agency meeting

agenda city of watsonville city council/redevelopment agency meeting

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The grant application is due on July 1, 2011. A detailed scope <strong>of</strong> work,<br />

project description and a conceptual plan incorporates the top five<br />

priorities identified by the public in 2010.<br />

Proposed Park Renovation Plan.<br />

A. Renovated soccer fields with new synthetic turf and field lighting:<br />

The two existing soccer fields will be converted to synthetic turf fields.<br />

This will provide day-in and day out use <strong>of</strong> the fields regardless <strong>of</strong> the<br />

weather or time <strong>of</strong> year. Soccer is a very important element <strong>of</strong> the<br />

Watsonville community, and the demand for quality fields is never met.<br />

The conversion to turf would also lower maintenance costs both in<br />

terms <strong>of</strong> landscaping care by City Park staff, and minimizing the use <strong>of</strong><br />

water for irrigation. Included in this scope <strong>of</strong> work is the installation <strong>of</strong><br />

stadium lights for evening use, and aluminum bleachers installed along<br />

one side <strong>of</strong> each field for spectators.<br />

B. Renovated picnic areas, gathering spaces, and playground areas,<br />

including a new walking trail:<br />

Existing picnic areas and playground areas, that have become worn<br />

and outdated, will be removed, and new picnic areas, gathering spaces<br />

for the public, and up to three new playground structures will be<br />

constructed. Work will entail new design areas for both smaller picnic<br />

areas and larger crowds, new site amenities (benches, tables, etc.),<br />

site concrete, architectural concrete and pavers, drainage systems,<br />

and site lighting. All <strong>of</strong> this work will be enhanced by new landscaping<br />

and supporting irrigation. All work will be designed and installed to<br />

meet current ADA standards, as well as low impact drainage<br />

standards.<br />

A new walking trail that circumnavigates the park will be designed and<br />

installed. This trail will tie together the new picnic areas, play grounds,<br />

and sports fields with the existing Nature Center, Recreation Center,<br />

and <strong>city</strong> wide trail system that lead to existing walking trails around City<br />

Page 4 <strong>of</strong> 6<br />

p:\<strong>city</strong><strong>council</strong>\staffreports\2011\prop 84 grant applicationround ii.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!