01.12.2014 Views

agenda city of watsonville city council/redevelopment agency meeting

agenda city of watsonville city council/redevelopment agency meeting

agenda city of watsonville city council/redevelopment agency meeting

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 5 - Water Supply Reliability and Water Shortage Contingency Planning<br />

#5. An urban water supplier shall describe in the plan water management tools and<br />

options used by that entity that will maximize resources and minimize the need to import<br />

water from other regions (10620(f)).<br />

#23. For any water source that may not be available at a consistent level <strong>of</strong> use, given<br />

specific legal, environmental, water quality, or climatic factors, describe plans to<br />

supplement or replace that source with alternative sources or water demand<br />

management measures, to the extent practicable (10631(c)(2)).<br />

The City has incorporated a number <strong>of</strong> resource maximization tools into the management and operation<br />

<strong>of</strong> the water utility. The City’s main emphasis is in water conservation as detailed in Section 6 - Demand<br />

Management Measures <strong>of</strong> this report. City coordination with the Pajaro Valley Water Management<br />

Agency (PVWMA) on the basin management plan is aimed at reducing the current overdraft. This will<br />

help reduce the amount <strong>of</strong> water potentially required for basin management through importation from<br />

outside wholesalers or regions.<br />

The City does not import or buy water from any other sources. It relies solely on the groundwater in the<br />

Pajaro Valley Basin and the surface water from Corralitos Creek and Browns Creek in the Pajaro River<br />

watershed.<br />

Fourteen groundwater wells currently provide the City <strong>of</strong> Watsonville with an approximate average <strong>of</strong><br />

6,850 acre-feet <strong>of</strong> water per year. All City water is treated at each well site and meets or exceeds State<br />

and Federal drinking water standards.<br />

The City enjoys pre-1914 water rights on Corralitos and Browns creeks, north <strong>of</strong> the City limits. The<br />

surface diversions are piped to the Corralitos Filter Plant (CFP) and are treated via slow sand filtration<br />

and disinfection. The CFP averages approximately 900 acre-feet <strong>of</strong> water per year, though it has a<br />

capa<strong>city</strong> <strong>of</strong> 2,400 acre-feet per year. Its operation is limited by the amount <strong>of</strong> surface water available in<br />

the Corralitos and Browns Creeks. At the Eureka Canyon Intake minimum bypass flows must be<br />

maintained by the City to allow for fish passage. The CFP operates seasonally, typically starting in late<br />

spring through the fall. During the rainy season the CFP is usually shut down due to the high turbidity <strong>of</strong><br />

the intake water. Higher turbidity waters are not conducive to the efficiency <strong>of</strong> a slow sand filtration<br />

plant so a creek water turbidity <strong>of</strong> 10 NTU or less is desired. Only when these conditions are being met<br />

does the City collect and treat surface water for distribution.<br />

The City has operated without the CFP for extended periods <strong>of</strong> time. When it was severely damaged<br />

during the 1989 Loma Prieta Earthquake it was placed <strong>of</strong>fline and did not resume full operation until<br />

1996.<br />

28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!