11.07.2015 Views

RFP (Before Pre-Bid) - RISL - Government of Rajasthan

RFP (Before Pre-Bid) - RISL - Government of Rajasthan

RFP (Before Pre-Bid) - RISL - Government of Rajasthan

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>RISL</strong>: <strong>RFP</strong> FOR SETTING UP OF VIDEO CONFERENCE SOLUTION IN RAJASTHAN (BEFORE PRE-BID)23-Aug-134. SCOPE OF WORK, DELIVERABLES AND TIMELINESThe bidder shall be required to supply, install and integrate the solution as per the scope<strong>of</strong> work detailed below. O&M <strong>of</strong> the proposed video conference solution shall beprovided for a period <strong>of</strong> 5 years.The successful deployment <strong>of</strong> project requires the bidder to provide quality & timelyservices to GoR. The bidder is strongly advised to carefully read the Scope <strong>of</strong> Work,understand the RajSWAN/SecLAN/NIC networks and carry-out the site visits <strong>of</strong>proposed locations where VC solution and IT infrastructure is to be installed,implemented and commissioned as per BoM (Ref: Annexure-1).4.1. Detailed Scope <strong>of</strong> Work (SOW)Deployment <strong>of</strong> core video conference solution consists <strong>of</strong> various steps and activitieslike preparation <strong>of</strong> the detailed project implementation plan, supply <strong>of</strong> required hardwareand s<strong>of</strong>tware at project locations, implementation <strong>of</strong> video conference solution,commissioning, documentation, UAT reports with configuration details, basic trainingetc.Without restricting the generality <strong>of</strong> the above paragraph, the scope <strong>of</strong> work includesbut is not limited to the following:4.1.1 Understanding <strong>of</strong> ProjectTo understand the overall scope <strong>of</strong> project, the bidder shall be required to study thefollowing:a) Study:1) RajSWAN network2) Existing video conference solution <strong>of</strong> NIC/RSWAN for integration withrequired video conference solution to be deployed in the project3) Any other plan, policy, document and report as deemed necessary foreffective implementation <strong>of</strong> required video conference solution.b) Video conference requirement <strong>of</strong> <strong>RISL</strong>/DoIT&C/GoR under this project4.1.2 Infrastructure Deployment (Supply, Installation, Configuration andIntegration <strong>of</strong> the Hardware, S<strong>of</strong>tware & Network Infrastructure) -a) Supply <strong>of</strong> Hardware, S<strong>of</strong>tware, etc.1) It shall include (but not be limited to) the supply <strong>of</strong> the required items,equipment’s:a) given in minimum Bill <strong>of</strong> Material (Annexure-1) as per the work order,Seal & Signature <strong>of</strong> the Auth. Sign. Page 19 <strong>of</strong> 147

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!