11.07.2015 Views

RFP (Before Pre-Bid) - RISL - Government of Rajasthan

RFP (Before Pre-Bid) - RISL - Government of Rajasthan

RFP (Before Pre-Bid) - RISL - Government of Rajasthan

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>RISL</strong>: <strong>RFP</strong> FOR SETTING UP OF VIDEO CONFERENCE SOLUTION IN RAJASTHAN (BEFORE PRE-BID)23-Aug-135.9. Deadline for the submission <strong>of</strong> <strong>Bid</strong>sa) <strong>Bid</strong>s shall be received online at e-Procurement portal and up to the time and datespecified in the NIB.b) Normally, the date <strong>of</strong> submission and opening <strong>of</strong> <strong>Bid</strong>s will not be extended. Inexceptional circumstances or when the bidding document are required to besubstantially modified as a result <strong>of</strong> discussions in pre-bid meeting/ conference orotherwise and the time with the prospective bidders for preparation <strong>of</strong> <strong>Bid</strong>s appearsinsufficient, the date may be extended by the procuring entity. In such case thepublicity <strong>of</strong> extended time and date shall be given in the manner, as was given atthe time <strong>of</strong> issuing the original NIB and shall also be placed on the State PublicProcurement Portal, if applicable. It shall be ensured that after issue <strong>of</strong> corrigendum,reasonable time is available to the bidders for preparation and submission <strong>of</strong> their<strong>Bid</strong>s. The procuring entity shall also publish such modifications in the biddingdocument in the same manner as the publication <strong>of</strong> initial bidding document. If, inthe <strong>of</strong>fice <strong>of</strong> the <strong>Bid</strong>s receiving and opening authority, the last date <strong>of</strong> submission oropening <strong>of</strong> <strong>Bid</strong>s is a non-working day, the <strong>Bid</strong>s shall be received or opened on thenext working day.5.10. Withdrawal, Substitution, and Modification <strong>of</strong> <strong>Bid</strong>sa) If permitted on e-Procurement portal, a <strong>Bid</strong>der may withdraw its <strong>Bid</strong> or re-submit its<strong>Bid</strong> (technical and/ or financial cover) as per the instructions/ procedure mentionedat e-Procurement website under the section “<strong>Bid</strong>der’s Manual Kit”.b) <strong>Bid</strong>s withdrawn shall not be opened and processed further.5.11. Opening <strong>of</strong> <strong>Bid</strong>sa) The <strong>Bid</strong>s shall be opened by the bid opening & evaluation committee on the dateand time mentioned in the NIB in the presence <strong>of</strong> the bidders or their authorisedrepresentatives who choose to be present.b) The committee may co-opt experienced persons in the committee to conduct theprocess <strong>of</strong> <strong>Bid</strong> opening.c) The committee shall prepare a list <strong>of</strong> the bidders or their representatives attendingthe opening <strong>of</strong> <strong>Bid</strong>s and obtain their signatures on the same. The list shall alsocontain the representative’s name and telephone number and correspondingSeal & Signature <strong>of</strong> the Auth. Sign. Page 38 <strong>of</strong> 147

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!