11.07.2015 Views

RFP (Before Pre-Bid) - RISL - Government of Rajasthan

RFP (Before Pre-Bid) - RISL - Government of Rajasthan

RFP (Before Pre-Bid) - RISL - Government of Rajasthan

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>RISL</strong>: <strong>RFP</strong> FOR SETTING UP OF VIDEO CONFERENCE SOLUTION IN RAJASTHAN (BEFORE PRE-BID)23-Aug-134) Plugging conduits and entrance holes wherever cabling is essential with suitablesealing material.5) Deploying the video conference solution at RSDC in consultation with theDoIT&C/<strong>RISL</strong> and adhere to all the applicable RSDC and RajSWAN policies (IPAddressing, Access Control, Security, Backup/ Restore, Internet access,Routing and Switching etc.) as applicable throughout the project period.6) Integrating the deployed video conference solution with existing videoconference setup in state by NIC and RajSWAN in consultation with the NIC andRajSWAN operator. Integration here means that VC client <strong>of</strong> this proposedsolution should be able to call any VC client <strong>of</strong> the NIC VC solution and to anyVC client <strong>of</strong> the RajSWAN VC solution and vice-versa.4.1.3 TrainingIt shall include the following:a) <strong>Pre</strong>paring VC operating/training document to train users on VC operations. Thelanguage <strong>of</strong> training document shall be in Hindi or English. It is clarified that thistraining does not include training on computer operations.b) Imparting the basic on-site training to users <strong>of</strong> VC clients ie the supplied all-in-onePCs (one user per PC), for VC operations so as to make them well conversant withthe functionalities, features and processes <strong>of</strong> Video Conference at respective projectlocations.c) Providing a hardcopy <strong>of</strong> VC training document to each user.4.1.4 User Acceptance Testing (UAT)The primary goal <strong>of</strong> Acceptance Testing is to ensure that the Project (including all theproject components as discussed in the scope <strong>of</strong> work) meets requirements, standards,specifications and performance, by ensuring that the following are associated with clear,quantifiable metrics for accountability:‣ Infrastructure Compliance Review to verify the conformity <strong>of</strong> the Infrastructure(both IT, non IT ) supplied by the selected <strong>Bid</strong>der against the requirementsand specifications provided in the <strong>RFP</strong> and/or as proposed in the proposalsubmitted by the selected <strong>Bid</strong>der‣ Performance‣ Project DocumentationSeal & Signature <strong>of</strong> the Auth. Sign. Page 21 <strong>of</strong> 147

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!