Download the 2009 annual report in PDF format - ANF
Download the 2009 annual report in PDF format - ANF
Download the 2009 annual report in PDF format - ANF
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
9.3 Committed and secured developments<br />
Three developments are currently underway <strong>in</strong> Marseilles and Lyons.<br />
Taken toge<strong>the</strong>r, <strong>the</strong>se developments represent a total <strong>in</strong>vestment<br />
of around €57 million. These developments are partly fi nanced by<br />
means of a €250 million credit facility (Calyon) and by dedicated<br />
fi nanc<strong>in</strong>g of around €6 million provided by <strong>the</strong> Mart<strong>in</strong> Maurel bank.<br />
Fauchier, Marseilles<br />
This new offi ce and residential programme, located close to place<br />
de la Joliette, will suit companies look<strong>in</strong>g to be at <strong>the</strong> heart of <strong>the</strong><br />
bus<strong>in</strong>ess district, as well as meet<strong>in</strong>g demand from new residents<br />
work<strong>in</strong>g <strong>in</strong> <strong>the</strong> area. The development consists of 19,500 square<br />
metres of net fl oor space, break<strong>in</strong>g down <strong>in</strong>to 13,000 square<br />
metres of offi ce space and 6,500 square metres of jo<strong>in</strong>tly-marketed<br />
residential units, plus a 305-space car park. Completion of <strong>the</strong><br />
offi ces is scheduled for Q4 2010 with residential units follow<strong>in</strong>g<br />
<strong>in</strong> H1 2011. A portion of <strong>the</strong> offi ce programme has been sold offplan<br />
and <strong>the</strong> o<strong>the</strong>r portion is already leased to a s<strong>in</strong>gle tenant for<br />
€2.1 million.<br />
9.4 Development programme<br />
A €268 million programme has been drawn up <strong>in</strong>volv<strong>in</strong>g both <strong>the</strong><br />
construction of new build<strong>in</strong>gs on <strong>the</strong> Company’s land reserves<br />
and <strong>the</strong> complete overhaul of certa<strong>in</strong> real estate blocks. The<br />
new developments (Rabatau, Rive Neuve, Block 34) have been<br />
granted <strong>the</strong> necessary permits (with <strong>the</strong> exception of Rive<br />
Neuve). In parallel, <strong>ANF</strong> is also completely overhaul<strong>in</strong>g certa<strong>in</strong><br />
real estate blocks (Dames, Block 25, Pavillon Vacon, TAT).<br />
A. Rabatau, Marseilles<br />
In this district adjo<strong>in</strong><strong>in</strong>g Boulevard du Prado, <strong>ANF</strong> can build an offi ce<br />
build<strong>in</strong>g with a total surface area of around 3,900 square metres,<br />
with<strong>in</strong> a period of 13 months. Rental <strong>in</strong>come is estimated to be<br />
around €0.6 million. As part of this project, <strong>ANF</strong> is apply<strong>in</strong>g <strong>the</strong> HQE<br />
(Haute Qualité Environnementale – High Environmental Quality)<br />
standard with a view to hav<strong>in</strong>g <strong>the</strong> build<strong>in</strong>g certifi ed.<br />
B. Rive Neuve, Marseilles<br />
The Rive Neuve project, located <strong>in</strong> <strong>the</strong> Vieux-Port district of<br />
Marseilles, is <strong>in</strong>tended to renovate some 3,200 square metres of<br />
offi ce space and retail premises (442 square metres of which already<br />
existed) with rental <strong>in</strong>come of around €0.7 million. It is anticipated<br />
that this work will take 18 months from start to fi nish. As part of this<br />
project, <strong>ANF</strong> is apply<strong>in</strong>g <strong>the</strong> HQE standard with a view to hav<strong>in</strong>g <strong>the</strong><br />
build<strong>in</strong>g certifi ed.<br />
C. Block 34, Marseilles<br />
Cont<strong>in</strong>u<strong>in</strong>g its policy of actively <strong>in</strong>vest<strong>in</strong>g <strong>in</strong> Marseilles, <strong>ANF</strong> will<br />
develop a programme consist<strong>in</strong>g of around 26,000 square metres<br />
Forb<strong>in</strong>, Marseilles<br />
DESCRIPTION OF THE BUSINESS<br />
Developments a particularly rigorous <strong>in</strong>vestment strategy<br />
Close to place de la Joliette, <strong>ANF</strong> has started <strong>the</strong> construction of<br />
a 125 rooms hotel to be completed <strong>in</strong> Q4 2010. The hotel will be<br />
operated by <strong>the</strong> B&B cha<strong>in</strong>, France’s third largest budget hotel<br />
cha<strong>in</strong>. Rental <strong>in</strong>come is expected to be around €0.6 million.<br />
Mansard-style attic space, Lyons<br />
<strong>ANF</strong> has identifi ed about 5,100 square metres of Mansard-style<br />
attic space that requires major renovation before be<strong>in</strong>g rented. This<br />
renovation should make it possible to create around 119 apartments<br />
completed between <strong>2009</strong> and 2011. This work is be<strong>in</strong>g carried out<br />
<strong>in</strong> close cooperation with Architecte des Bâtiments de France,<br />
<strong>in</strong> particular for <strong>the</strong> restoration of <strong>the</strong> façades and roofi ng. These<br />
spaces did not previously generate <strong>in</strong>come. The fi rst renovated<br />
apartments were completed and rented <strong>in</strong> <strong>2009</strong>. Total <strong>in</strong>vestment<br />
exclud<strong>in</strong>g land is about €15.0 million.<br />
of residential units, offi ce space, a hotel, a residence for <strong>the</strong> aged<br />
and retail premises (some of which may be sold off) on block 34,<br />
its land adjo<strong>in</strong><strong>in</strong>g <strong>the</strong> new hospital. The offi cial permits connected<br />
with this project have all been cleared and <strong>the</strong> future rental <strong>in</strong>come<br />
is estimated to be €4.0 million.<br />
D. Dames, Marseilles<br />
�<br />
On Boulevard des Dames, <strong>ANF</strong> will restore a Haussmann-style<br />
block with 10,000 square metres of retail premises and residential<br />
units. The rental <strong>in</strong>come is expected to be around €1.3 million,<br />
follow<strong>in</strong>g 24 months of work.<br />
E. Block 25 – Retail premises, residential units<br />
and offi ce space, Marseilles<br />
<strong>ANF</strong> merged a number of retail premises that are currently vacant<br />
and will redevelop <strong>the</strong>m. This complex is located <strong>in</strong> <strong>the</strong> immediate<br />
vic<strong>in</strong>ity of place de la Joliette and will be available follow<strong>in</strong>g<br />
12 months of work. <strong>ANF</strong> will also renovate <strong>the</strong> offi ces and residential<br />
areas. Rental <strong>in</strong>come is estimated to be around €2.8 million.<br />
F. Pavillon-Vacon, Marseilles<br />
Contents<br />
<strong>ANF</strong> is restructur<strong>in</strong>g a central block with a surface area of about<br />
10,000 square metres: optimis<strong>in</strong>g residential units and alter<strong>in</strong>g <strong>the</strong><br />
ground fl oor layout so as to create retail premises <strong>in</strong> this soughtafter<br />
area, close to rue Sa<strong>in</strong>t Ferréol. The fi nal portion of <strong>the</strong> work<br />
will be completed <strong>in</strong> 2010. Rental <strong>in</strong>come is estimated to be around<br />
€2.2 million.<br />
<strong>ANF</strong> • <strong>2009</strong> ANNUAL REPORT<br />
19<br />
OTHER GENERAL GENERAL INFORMATION PRO FORMA FINANCIAL INFORMATION ANNUAL FINANCIAL STATEMENTS CONSOLIDATED FINANCIAL FINANCIAL STATEMENTS INFORMATION ABOUT <strong>ANF</strong> DESCRIPTION OF OF THE BUSINESS