27.11.2012 Views

Download the 2009 annual report in PDF format - ANF

Download the 2009 annual report in PDF format - ANF

Download the 2009 annual report in PDF format - ANF

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

9.3 Committed and secured developments<br />

Three developments are currently underway <strong>in</strong> Marseilles and Lyons.<br />

Taken toge<strong>the</strong>r, <strong>the</strong>se developments represent a total <strong>in</strong>vestment<br />

of around €57 million. These developments are partly fi nanced by<br />

means of a €250 million credit facility (Calyon) and by dedicated<br />

fi nanc<strong>in</strong>g of around €6 million provided by <strong>the</strong> Mart<strong>in</strong> Maurel bank.<br />

Fauchier, Marseilles<br />

This new offi ce and residential programme, located close to place<br />

de la Joliette, will suit companies look<strong>in</strong>g to be at <strong>the</strong> heart of <strong>the</strong><br />

bus<strong>in</strong>ess district, as well as meet<strong>in</strong>g demand from new residents<br />

work<strong>in</strong>g <strong>in</strong> <strong>the</strong> area. The development consists of 19,500 square<br />

metres of net fl oor space, break<strong>in</strong>g down <strong>in</strong>to 13,000 square<br />

metres of offi ce space and 6,500 square metres of jo<strong>in</strong>tly-marketed<br />

residential units, plus a 305-space car park. Completion of <strong>the</strong><br />

offi ces is scheduled for Q4 2010 with residential units follow<strong>in</strong>g<br />

<strong>in</strong> H1 2011. A portion of <strong>the</strong> offi ce programme has been sold offplan<br />

and <strong>the</strong> o<strong>the</strong>r portion is already leased to a s<strong>in</strong>gle tenant for<br />

€2.1 million.<br />

9.4 Development programme<br />

A €268 million programme has been drawn up <strong>in</strong>volv<strong>in</strong>g both <strong>the</strong><br />

construction of new build<strong>in</strong>gs on <strong>the</strong> Company’s land reserves<br />

and <strong>the</strong> complete overhaul of certa<strong>in</strong> real estate blocks. The<br />

new developments (Rabatau, Rive Neuve, Block 34) have been<br />

granted <strong>the</strong> necessary permits (with <strong>the</strong> exception of Rive<br />

Neuve). In parallel, <strong>ANF</strong> is also completely overhaul<strong>in</strong>g certa<strong>in</strong><br />

real estate blocks (Dames, Block 25, Pavillon Vacon, TAT).<br />

A. Rabatau, Marseilles<br />

In this district adjo<strong>in</strong><strong>in</strong>g Boulevard du Prado, <strong>ANF</strong> can build an offi ce<br />

build<strong>in</strong>g with a total surface area of around 3,900 square metres,<br />

with<strong>in</strong> a period of 13 months. Rental <strong>in</strong>come is estimated to be<br />

around €0.6 million. As part of this project, <strong>ANF</strong> is apply<strong>in</strong>g <strong>the</strong> HQE<br />

(Haute Qualité Environnementale – High Environmental Quality)<br />

standard with a view to hav<strong>in</strong>g <strong>the</strong> build<strong>in</strong>g certifi ed.<br />

B. Rive Neuve, Marseilles<br />

The Rive Neuve project, located <strong>in</strong> <strong>the</strong> Vieux-Port district of<br />

Marseilles, is <strong>in</strong>tended to renovate some 3,200 square metres of<br />

offi ce space and retail premises (442 square metres of which already<br />

existed) with rental <strong>in</strong>come of around €0.7 million. It is anticipated<br />

that this work will take 18 months from start to fi nish. As part of this<br />

project, <strong>ANF</strong> is apply<strong>in</strong>g <strong>the</strong> HQE standard with a view to hav<strong>in</strong>g <strong>the</strong><br />

build<strong>in</strong>g certifi ed.<br />

C. Block 34, Marseilles<br />

Cont<strong>in</strong>u<strong>in</strong>g its policy of actively <strong>in</strong>vest<strong>in</strong>g <strong>in</strong> Marseilles, <strong>ANF</strong> will<br />

develop a programme consist<strong>in</strong>g of around 26,000 square metres<br />

Forb<strong>in</strong>, Marseilles<br />

DESCRIPTION OF THE BUSINESS<br />

Developments a particularly rigorous <strong>in</strong>vestment strategy<br />

Close to place de la Joliette, <strong>ANF</strong> has started <strong>the</strong> construction of<br />

a 125 rooms hotel to be completed <strong>in</strong> Q4 2010. The hotel will be<br />

operated by <strong>the</strong> B&B cha<strong>in</strong>, France’s third largest budget hotel<br />

cha<strong>in</strong>. Rental <strong>in</strong>come is expected to be around €0.6 million.<br />

Mansard-style attic space, Lyons<br />

<strong>ANF</strong> has identifi ed about 5,100 square metres of Mansard-style<br />

attic space that requires major renovation before be<strong>in</strong>g rented. This<br />

renovation should make it possible to create around 119 apartments<br />

completed between <strong>2009</strong> and 2011. This work is be<strong>in</strong>g carried out<br />

<strong>in</strong> close cooperation with Architecte des Bâtiments de France,<br />

<strong>in</strong> particular for <strong>the</strong> restoration of <strong>the</strong> façades and roofi ng. These<br />

spaces did not previously generate <strong>in</strong>come. The fi rst renovated<br />

apartments were completed and rented <strong>in</strong> <strong>2009</strong>. Total <strong>in</strong>vestment<br />

exclud<strong>in</strong>g land is about €15.0 million.<br />

of residential units, offi ce space, a hotel, a residence for <strong>the</strong> aged<br />

and retail premises (some of which may be sold off) on block 34,<br />

its land adjo<strong>in</strong><strong>in</strong>g <strong>the</strong> new hospital. The offi cial permits connected<br />

with this project have all been cleared and <strong>the</strong> future rental <strong>in</strong>come<br />

is estimated to be €4.0 million.<br />

D. Dames, Marseilles<br />

�<br />

On Boulevard des Dames, <strong>ANF</strong> will restore a Haussmann-style<br />

block with 10,000 square metres of retail premises and residential<br />

units. The rental <strong>in</strong>come is expected to be around €1.3 million,<br />

follow<strong>in</strong>g 24 months of work.<br />

E. Block 25 – Retail premises, residential units<br />

and offi ce space, Marseilles<br />

<strong>ANF</strong> merged a number of retail premises that are currently vacant<br />

and will redevelop <strong>the</strong>m. This complex is located <strong>in</strong> <strong>the</strong> immediate<br />

vic<strong>in</strong>ity of place de la Joliette and will be available follow<strong>in</strong>g<br />

12 months of work. <strong>ANF</strong> will also renovate <strong>the</strong> offi ces and residential<br />

areas. Rental <strong>in</strong>come is estimated to be around €2.8 million.<br />

F. Pavillon-Vacon, Marseilles<br />

Contents<br />

<strong>ANF</strong> is restructur<strong>in</strong>g a central block with a surface area of about<br />

10,000 square metres: optimis<strong>in</strong>g residential units and alter<strong>in</strong>g <strong>the</strong><br />

ground fl oor layout so as to create retail premises <strong>in</strong> this soughtafter<br />

area, close to rue Sa<strong>in</strong>t Ferréol. The fi nal portion of <strong>the</strong> work<br />

will be completed <strong>in</strong> 2010. Rental <strong>in</strong>come is estimated to be around<br />

€2.2 million.<br />

<strong>ANF</strong> • <strong>2009</strong> ANNUAL REPORT<br />

19<br />

OTHER GENERAL GENERAL INFORMATION PRO FORMA FINANCIAL INFORMATION ANNUAL FINANCIAL STATEMENTS CONSOLIDATED FINANCIAL FINANCIAL STATEMENTS INFORMATION ABOUT <strong>ANF</strong> DESCRIPTION OF OF THE BUSINESS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!