12.07.2015 Views

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Run<strong>of</strong>f Treatment Control Measure Fact SheetConstructed Wetland BasinTable CWB-2. Distribution <strong>of</strong> Wetland ComponentsComponents% Permanent PoolSurface Area <strong>Design</strong> Water DepthForebay 5-10% 4 feet (minimum)Open-water zone 10-50% 4 feet (minimum)Wetland zones withemergent vegetation50-70% 6 to 12 inches (30% to 50% <strong>of</strong> this area should be 1foot deep with bottom slope ≤ 10%)Outlet zone 5-10% 3 feet (minimum)Step 4 – Determine Surcharge Depth <strong>of</strong> WQV above Permanent Pool and Maximum WaterSurface ElevationThe surcharge depth <strong>of</strong> the WQV above the permanent pool’s water surface (D WQV ) should be ≤ 2.0 feet.a. Estimate WQV surcharge depth (D WQV ) based on A pp .D WQV = WQV/A ppb. If D WQV > 2.0 feet, adjust value <strong>of</strong> V pp and/or D avg to increase A pp and yield D WQV ≤ 2.0.The water surface <strong>of</strong> the basin will be greater than A pp when the WQV is added to the permanentpool.c. Estimate maximum water surface area (A WQV ) with WQV based on basin shape.d. Recalculate Final D WQV based on A WQV and A pp . Note: V pp and/or D avg can be adjusted to yieldFinal D WQV ≤ 2.0 feet.Final D WQV = WQV/((A WQV + A pp )/2)e. Calculate maximum water surface elevation in basin with WQV.WS Elev WQV = WS Elev pp + Final D WQVStep 5 – Determine inflow requirementA net inflow <strong>of</strong> water must be available at all times through a perennial base flow or supplemental watersource. Use the following equation and parameters to estimate the quantity <strong>of</strong> monthly inflow required atvarious times <strong>of</strong> the year. The maximum monthly requirement will govern the design requirement.Q inflow = Q E-P + Q seepage + Q ETwhereQ inflow = Estimated base flow (acre-ft/mo.) (Estimate by seasonal measurementsand/or comparison to similar watersheds)Q E-P = Loss due to evaporation minus the gain due to precipitation (acre-ft/mo.)Q seepage = Loss or gain due to seepage to groundwater (acre-ft/mo.)Q ET = Loss due to evapotranspiration (additional loss through plant area abovewater surface not including the water surface) (acre-ft/mo.)Note that an impermeable liner may be required to maintain permanent pool level in areas with extremelypermeable soils.<strong>Stormwater</strong> <strong>Quality</strong> <strong>Design</strong> <strong>Manual</strong> for the <strong>Sacramento</strong> and South Placer RegionsCWB-4 <strong>May</strong> <strong>2007</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!