12.07.2015 Views

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix D-2: Commercial and Multi-Family Sites*: Run<strong>of</strong>f Reduction Credits and Treatment BMP Sizing CalculationsName <strong>of</strong> Drainage Shed:Location <strong>of</strong> project:Step 1 - Calculate Area Requiring TreatmentFill in Higlighted boxesDrainage Shed Area acres AOpen Space Acreage and Landscaped Areas** acres A OSArea with Run<strong>of</strong>f Reduction Potential A - A OS = 0.00 acres A Tsee areaexample belowAssumed Initial Impervious Fraction A T / A = 0.00I*. Includes apartments, condominiums, and townhouses**. Includes all areas maintained in a natural state and planned for landscapingStep 2 - Calculate Impervious Area TreatmentsRun<strong>of</strong>f Reduction TreatmentsPorous Pavement:ImperviousAreaManagedEfficiencyFactorEffective AreaManaged (A C )Option 1: Porous Pavement acres x = 0.000 acres(see Fact Sheet, excludes porous pavement used in Option 2)Option 2: Disconnected Pavement use Form D-2a for credits 0.00 acres(see Fact Sheet, excludes porous pavement used in Option 1)Landscaping used to Disconnect Pavement acres = 0.00 acres(see Fact Sheet)Disconnected Ro<strong>of</strong> Drains acres = 0.00 acres(see Fact Sheet and/or Table D-2b for summary <strong>of</strong> requirements)Ecoro<strong>of</strong> acres = 0.00 acres(see Fact Sheet)Interceptor Trees use Form D-2b for credits 0.00 acres(see Fact Sheet)Total Effective Area Managed A C 0.00 acresAdjusted Area for Flow-Based Treatment A T - A C = 0.00 A ATAdjusted Impervious Fraction A AT / A = 0.00 I ATable D-2aTable D-2bPorous Pavement TypeEfficiencyMultiplierMaximum ro<strong>of</strong> sizeMinimum traveldistanceCobblestone Block Pavement 0.40 ≤ 3,500 sq ft21 ftPervious Concrete/Asphalt0.60Pavement≤ 5,000 sq ft24 ftModular Block Pavement &0.75Porous Gravel Pavement≤ 7,500 sq ft28 ftReinforced Grass Pavement 1.00 ≤ 10,000 sq ft32 ftCheck the website for the electronic version at www.sactostormwater.org click on "new development"

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!