12.07.2015 Views

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

These tables refer to run<strong>of</strong>f reduction credit worksheets/forms which can be found in Appendix D-1 and D-2 <strong>of</strong> this<strong>Design</strong> <strong>Manual</strong>.Run<strong>of</strong>f Reduction Credits for Alternative DrivewaysVariationPervious DrivewayHollywoodDrivewayDisconnectedDrivewayShared DrivewayApplications and Run<strong>of</strong>f Reduction CreditsResidential — credits can be applied for the entire driveway surface when approvedmaterials and specifications are used in accordance with the <strong>Design</strong> Requirements.Use Appendix D-1.Residential — an efficiency multiplier <strong>of</strong> 75% <strong>of</strong> the driveway area when approvedmaterials and specifications are used in accordance with the <strong>Design</strong> Requirements.Use Appendix D-1.Residential — credits can be for the entire driveway surface when designedaccording to this fact sheet. Use Appendix D-1.Residential — credits vary according to design. Consult municipal engineerRun<strong>of</strong>f Reduction Credits for Disconnected Ro<strong>of</strong> DrainsVariationSplash Block/Pop-up Drainage EmitterResidentialApplications and Run<strong>of</strong>f Reduction CreditsCredit may be given for each disconnected ro<strong>of</strong> drain with the amount <strong>of</strong> creditdependent upon building set back. This calculation is simplified in Appendix D-1.CommercialCredit may be given for each disconnected ro<strong>of</strong> drain meeting the designrequirements. The credit calculation is simplified in Appendix D-2.Dispersal Trench and Dry WellResidentialCommercialCredit may be given for each disconnected ro<strong>of</strong> drain meeting the designrequirements. The credit calculation is simplified in Appendix D-1.Credit may be given for each disconnected ro<strong>of</strong> drain meeting the designrequirements. The credit calculation is simplified in Appendix D-2.Run<strong>of</strong>f Reduction Credits for Interceptor TreesVariationAll Planted TreesApplications and Run<strong>of</strong>f Reduction CreditsResidential - Credit may be given for each new tree planted in the municipal right<strong>of</strong>-way.Consult municipality about the possibility <strong>of</strong> credits for trees outside <strong>of</strong> themunicipal right-<strong>of</strong>-way. This calculation is simplified in Appendix D-1.Commercial - Credit may be given for each new tree planted within 25 feet <strong>of</strong>ground level impervious surfaces. 25% <strong>of</strong> trees already required by zoning can beused for Interceptor Tree credits. This calculation is simplified in Appendix D-2.New Evergreen Trees 200 square feet <strong>of</strong> creditNew Deciduous Trees 100 square feet <strong>of</strong> creditExisting Trees The Run<strong>of</strong>f Reduction Credit, as applied to existing trees, is calculated by identifyingthe square-footage equal to one-half <strong>of</strong> the existing tree canopy, measured within thedrip line. The resulting square footage divided by the total site square footage isequal to the IRP. This calculation is simplified in Appendix D-1 and D-2.*Trees required by the municipality as mitigation for other trees lost on the project will not count toward Run<strong>of</strong>f Reduction Credit<strong>Stormwater</strong> <strong>Quality</strong> <strong>Design</strong> <strong>Manual</strong> for the <strong>Sacramento</strong> and South Placer Regions<strong>May</strong> <strong>2007</strong> Appendix D-3 Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!