12.07.2015 Views

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Technical RequirementsVegetated SwaleStep 6 – Select VegetationA full, dense cover <strong>of</strong> sod-forming vegetation is typically recommended for vegetated swales, since mostpollutant removal performance studies are based on use <strong>of</strong> grass. Alternative vegetation such as shrubsand groundcovers may also be allowed; check with the local permitting agency.Select vegetation that:• Will be dense and strong enough to stay upright, even in flowing water and steep slopes;• Has minimum need for fertilizers;• Is not prone to pests and will not require a lot <strong>of</strong> pesticide/herbicide application, consistent withany integrated pest management (IPM) practices or policies <strong>of</strong> the local permitting agency;• Will withstand being inundated for periods <strong>of</strong> time; and• Needs little supplemental water, consistent with local water conservation ordinances. Bunch-typegrasses or grass mixes are preferred.Check with the permitting agency for approved plant and tree lists. Do not use bark or similar buoyantmaterial in the swale or around drain inlets or outlets.Construction Considerations• Divert run<strong>of</strong>f (other than necessary irrigation) during the period <strong>of</strong> vegetation establishment.Where run<strong>of</strong>f diversion is not possible, cover graded and seeded areas with suitable erosioncontrol materials.• Install sediment controls (e.g., staked straw wattles) around the swale to prevent high sedimentloads from entering the swale during ongoing upstream construction activities.• Repair, seed, or re-plant damaged areas immediately.• Apply erosion control measures as needed to stabilize side slopes and inlet areas.Long-Term MaintenanceThe local permitting agencies in the <strong>Sacramento</strong> and SouthPlacer areas will require execution <strong>of</strong> a maintenanceagreement or permit with the property owner for projectsincluding a vegetated swale. Check with the localpermitting agency about the timing for execution <strong>of</strong> theagreement. Such agreements will typically includerequirements such as those outlined in Table VS-2. Theproperty owner or his/her designee will be responsible forcompliance. See Appendix B for additional informationabout maintenance requirements and sample agreementlanguage.Swales with rock in the flowline are discouraged dueto high maintenance needs (including use <strong>of</strong> weedkillers) and potential for mosquito breeding.<strong>Stormwater</strong> <strong>Quality</strong> <strong>Design</strong> <strong>Manual</strong> for the <strong>Sacramento</strong> and South Placer Regions<strong>May</strong> <strong>2007</strong>VS-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!