12.07.2015 Views

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Run<strong>of</strong>f Reduction Control Measure Fact SheetPorous Pavement<strong>Design</strong> Criteria<strong>Design</strong> criteria for porous pavement are listed in Table PP-1.Table PP-1. <strong>Design</strong> Criteria for Porous Pavement*Also see Appendix D for information on calculating run<strong>of</strong>f reduction credits.Pavement Type/ Parameter CriteriaPervious Concrete (Figure PP-1)Void spaceMinimum 15% throughout materialBase Course With underdrain - 8” minimum <strong>of</strong> coarse aggregate over 7” minimum sand over 3”minimum coarse aggregate; without underdrain - 12” minimum coarse aggregateLinerImpermeable liner required when Type C or D soils are present; A or B soils typesrequire geotextile filter cloth with 60 to 80 pores per inch.UnderdrainRequired when specified permeability range is not available in native soils. Use agravel trench or perforated pipe embedded in a 6-12-inch layer <strong>of</strong> crushed rock.Connect to storm drain (not sanitary sewer).Water Barrier The water barrier should be 24 inch wide thick visqueen run down the 12 inchdeep excavation and 12 inch under the drain rock, or use interceptor drain. Checkwith the geotechnical engineer.Modular Block Pavement (Figure PP-2)Void spaceMinimum 20% surface area as open annular spacesBase Course 8” minimum <strong>of</strong> coarse aggregateLinerSame as pervious concrete.Reinforced Grass Pavement (Figure PP-3)Base Course 10” minimum <strong>of</strong> compacted sandy gravel mixCobblestone Block Pavement (Figure PP-4)Void space Minimum 8% surface area as open annular spacesBase Course 7” minimum <strong>of</strong> coarse aggregate over 7” minimum <strong>of</strong> sand.LinerSame as pervious concrete.Porous Gravel Pavement (Figure PP-5)General With underdrain - 12” minimum <strong>of</strong> coarse aggregate over 7” minimum sand over 3”minimum coarse aggregate; without underdrain - 14” minimum coarse aggregateLinerSame as pervious concrete.Source: Urban Drainage and Flood Control District. Denver, Colorado*<strong>Design</strong> criteria may vary by permitting agency; check before proceeding with design. A permeability test will be required to verifysuitability <strong>of</strong> this technique for the site. A qualified engineer must provide site-specific design specifications for pavement installation.In addition, the manufacturer’s specifications apply.<strong>Stormwater</strong> <strong>Quality</strong> <strong>Design</strong> <strong>Manual</strong> for the <strong>Sacramento</strong> and South Placer Regions<strong>May</strong> <strong>2007</strong>PP-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!