12.07.2015 Views

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Technical RequirementsInfiltration BasinTable IB-3. <strong>Design</strong> Data Summary Sheet for Infiltration Basin<strong>Design</strong>er:Company:Project:Location:Date:1. Determine <strong>Design</strong> Water <strong>Quality</strong> Volumea. Tributary drainage areab. Water <strong>Quality</strong> VolumeArea = ft 2WQV = ft 32. Determine Maximum Allowable Depth (D max ≤ 10 ft)a. Maximum drawdown time (t = 48 hrs)b. Site infiltration rate (I)c. Safety factor (s)d.Dmaxtmax× I=12 × st = 48 hrI =s =D max =3. Determine Minimum Allowable Basin Bottom Area(A min = WQV/D max ) A min = in/hr4. Forebay Volume (VFB) VFB = ft 35. Bypass/Outlet Control Structure (Check type)in/hrft Overflow Structure Spillway6. Vegetation (Check type used or describe “Other”) Native grasses Irrigated turf grass OtherNotes:<strong>Stormwater</strong> <strong>Quality</strong> <strong>Design</strong> <strong>Manual</strong> for the <strong>Sacramento</strong> and South Placer Regions<strong>May</strong> <strong>2007</strong>IB-7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!