Run<strong>of</strong>f Treatment Control Measure Fact SheetInfiltration TrenchStep 3 – Calculate minimum surface area <strong>of</strong> infiltration trench bottom (A min )whereA min = WQV/D maxA min = minimum area required (ft 2 )D max= maximum allowable depth (ft)Step 4 – <strong>Design</strong> Observation WellProvide a vertical section <strong>of</strong> perforated PVC pipe, four (4) to six (6) inches in diameter, installed flushwith the top <strong>of</strong> the infiltration trench on a PVC footplate and with a locking, removable cap. Theobservation well is needed to monitor the infiltration rate in the infiltration trench and is useful formarking the location <strong>of</strong> the trench.Step 5 – <strong>Design</strong> BypassProvide for bypass or overflow <strong>of</strong> run<strong>of</strong>f volumes in excess <strong>of</strong> the WQV by means <strong>of</strong> a screened overflowpipe connected to the downstream storm drain system or a grated overflow outlet.Construction Considerations• If possible, stabilize the entire tributary area to the infiltration trench before construction begins.If this is not possible, divert flow around the trench site to protect it from sediment loads duringconstruction.• Once construction is complete, stabilize the entire tributary area to the trench before allowingrun<strong>of</strong>f to enter the trench facility.• Install filter fabric on sides, bottom, and one foot below the surface <strong>of</strong> the trench (see Figure IT-1). Provide generous overlap at all seams.• Store excavated material at least 10 feet from the trench to avoid backsliding and cave-ins.• Place clean, washed 1-3 inch gravel in the excavated trench in lifts and lightly compact it with aplate compactor. Using unwashed gravel can result in clogging.Long-Term MaintenanceThe local permitting agencies in the <strong>Sacramento</strong> and South Placer areas will require execution <strong>of</strong> amaintenance agreement or permit with the property owner for projects including an infiltration trench.Check with the local permitting agency about the timing for execution <strong>of</strong> the agreement. Such agreementswill typically include requirements such as those outlined in Table IT-2. The property owner or his/herdesignee will be responsible for compliance. See Appendix B for additional information aboutmaintenance requirements and sample agreement language.<strong>Stormwater</strong> <strong>Quality</strong> <strong>Design</strong> <strong>Manual</strong> for the <strong>Sacramento</strong> and South Placer RegionsIT-4 <strong>May</strong> <strong>2007</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!