12.07.2015 Views

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Run<strong>of</strong>f Treatment Control Measure Fact SheetWater <strong>Quality</strong> Detention Basins<strong>Design</strong> Criteria<strong>Design</strong> criteria for stormwater detention basins are listed in Table DB-1.Table DB-1. Water <strong>Quality</strong> Detention Basin <strong>Design</strong> Criteria<strong>Design</strong>ParameterDrainage areaCriteria for Basin TypeDry Wet Combo NotesTypically >20 acres<strong>Design</strong> volume WQV 1.25 WQV 1.125 WQV See Figure DB-3 and Appendix E in this manualfor details.Max DrawdownTimeDepth <strong>of</strong> Basin/Permanent Pond48 hrs See Appendix E.NA 4 ft. – 8 ft 4 ft. – 8 ft A 4 ft pond depth ensures an open water area,retards cattail growth, reduces stagnation, & allowsfor mosquito fish. Water deeper than 4 ft increasesthe residence time and results in lessheating/stagnation in summer.BasinShapeSide slopes (H:V)Embankment sideslope (H:V)Length 3X width (min.)3:1 or flatter3:1 or steeper4:1 or flatter3:1 or flatterAlways maximize the distance between the inletand outlet. Whenever possible, shape the basin togradually expand from the inlet then graduallycontract toward the outlet (e.g., teardrop.)Basin side slopesPermanent ponds side slopesInsideOutside (without retaining wall)Longitudinal slope/bottom surfaceSlope atleast 2%Undulatethe bottomdepthUndulatethe bottomdepthBasin freeboard1 ft.Treatment for dryweatherflowssubmergedgravel bedpermanentpondpermanentpondOther dry weather treatment features for drybasins may be approved by the permitting agencyon a case by case basis.Sediment ForebayVolume5% to 10% max <strong>of</strong> the total designvolumeSediment forebays may not be required; checkwith the local permitting agency.Step 1 – Calculate Water <strong>Quality</strong> Volume (WQV)Using Appendix E in this manual, determine the stormwater quality design volume, WQV, for thecontributing area. See Figure DB-3 and table DB-1 for the volume requirements for dry,combination and wet basins.Step 2 – <strong>Design</strong> the Basin<strong>Design</strong> the basin to:• Provide the required volume as determined in step 1.• Meet criteria on Table DB-1 regarding depth, shape, side slope and longitudinal slope• Incorporate a sediment forebay if required by the local agency. See step 3.<strong>Stormwater</strong> <strong>Quality</strong> <strong>Design</strong> <strong>Manual</strong> for the <strong>Sacramento</strong> and South Placer RegionsDB-4 <strong>May</strong> <strong>2007</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!