12.07.2015 Views

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

Stormwater Quality Design Manual (May 2007) - City of Sacramento ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PART II:Routing Excess Run<strong>of</strong>f through a Vegetative Swale(Use peak hydraulic flows on the site.)Q = Peak hydraulic flow rate(For <strong>Sacramento</strong> area projects, use Figure 2-5 <strong>Design</strong> Run<strong>of</strong>f Nolte Method from Section 9 <strong>of</strong> County<strong>of</strong> <strong>Sacramento</strong> Municipal Services Agency Improvement Standards October 1, 2006 to find Q.)Q = 1.5 cfs (Swale #1 treating a 3 acre site)To determine the capacity <strong>of</strong> the swale to convey peak hydraulic flows, use a roughnesscoefficient (n) <strong>of</strong> 0.10 with Manning’s Equation.Q = (1.49/n) (by + Zy 2 ) [ ( by + Zy 2 ) / (b + 2y√ (1 + Z 2 ))] 2/3 (s) 1/2 (eqn 3)1.5 = (1.49/.1) (5y + 3y 2 ) [(5y + 3y 2 ) / (5 + 2y√10)] 2/3 (.01) ½(Using the solver function: y 2 = .365 ft.)y 2 = Depth <strong>of</strong> peak drainage flow = 0.365 ft.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!