13.07.2015 Views

Operating Instructions - Snap-on Equipment

Operating Instructions - Snap-on Equipment

Operating Instructions - Snap-on Equipment

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pocket PC Maintenance1 2 3Figure 2G-22: Standards Screens: (1) ASM 5015, (2) ASM 2525, and (3) IM240New NO x SensorNew NO x sensor procedure is required when the cell is replaced, however periodicrecalibrati<strong>on</strong> is necessary as prompted during the normal Gas Calibrati<strong>on</strong> sequence(see Resetting NO x Cell Output Voltage, page 2G-6). Perform a new NO x sensorinitializati<strong>on</strong> whenever the NO x sensor is replaced, which should <strong>on</strong>ly be d<strong>on</strong>e byqualified pers<strong>on</strong>nel or when the NO x warning appears.To perform a new NO x sensor initializati<strong>on</strong>,1. Press the Maintenance butt<strong>on</strong> <strong>on</strong> the main menu.— The Maintenance menu displays.2. Choose Setup.— The Setup menu displays.3. Choose New NO x .— The NO x Sensor Initializati<strong>on</strong> screen displays.2G-18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!