Task 1.B.3areas.The CONSULTANT will determine the CITY’s MS4 major outfall drainageTask 1.C – Compile Other Relevant DataTask 1.C.1 The CONSULTANT will map high risk facilities as defined by the CITY’sNPDES permit and confirmed by the CITY. High risk facilities will be cursorily evaluatedand summarized.Task 1.C.2 The CONSULTANT will map the areas currently served by septic systemsand evaluate their potential to impact the CITY’s MS4. The CONSULTANT will contactPBC Health Department for available information on the septic tank failure rate within PBCand the CITY.Task 1.C.3 The CONSULTANT will map stormwater management areas currently servedby private stormwater systems based on information provided by the CITY and SFWMDpermit information.Task 1.D – Summarize Existing Levels <strong>of</strong> Service (“LOS”)Task 1.D.1 The CONSULTANT will identify the design storm level <strong>of</strong> protection forroadways and the minimum finished floor elevation for buildings as indicated by SFWMDpermits. Areas <strong>of</strong> the CITY not covered by a SFWMD permit will not reflect a LOS unlessthe CITY provides additional information or requests that an analysis be conducted asadditional services.Task 1.D.2 The CONSULTANT will identify the rainfall quantity associated with thewater quality volume as indicated by SFWMD permits. Areas <strong>of</strong> the CITY not covered by aSFWMD permit will not reflect a LOS unless the CITY provides additional information orrequests that an analysis be conducted as additional services.Task 1.E – Existing Information UpkeepTask 1.E.1 The CONSULTANT will develop, with the CITY’s assistance, a written planfor maintaining the integrity <strong>of</strong> the existing conditions information assembled by theCONSULTANT.Task 1.F – MeetingsTask 1.F.1 The CONSULTANT will meet with the CITY monthly (up to 2 hours eachmeeting) to discuss progress and the current status <strong>of</strong> the Task.L/bocaswmp/a6016.01/InterimReport 11-27-07/r02Page 3MOCK•ROOS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!